Product Name | Custom Precision CNC MACHINING PARTS |
Size | M1-M36,or non-standard as request&design |
Material | 1.Stainless Steel:AISI303, AISI304, AISI316F, 420,440,4140,4340etc. 2.Aluminum: Al6061, Al6063, Al7075, Al6082,etc. 3.Brass:C36000, C37700, Hpb59-1, H62, C27200(CuZn37),etc. 4.Steel: carbon steel, alloy steel, etc. 5.Copper 6. Plastic : PVC, POM, Nylon etc. |
Grade | 4.8,8.8,10.9,12.9.etc |
Standard | GB, DIN, ISO, ANSI/ASTM, BS, BSW, JIS etc |
Non-standards | OEM is available, according to drawing or samples |
Finish | Polishing,Painting,Chroming,Anodizing, Brushing, Silk Screening,Water Transfering, Laser Cutting,Leather Covering,Texture,Sanblasting,Gilding, UV Painting… |
Certification | ISO9001,IATF16949, |
Tolerance | 0.01-0.05mm can also be customized |
Design 3D Mould Drawing | • Our Engineer will design 3D mould drawing for your confirmation. • Design Software: Pro-E, Iges, UG, CAD etc • Mould Base Material: LKM, HASKCO, LOCAL, DME etc • Mould Core Material: 718H, S136H, NAK80, P20 ect • Mould Cavity: Single & Multi Cavity •Runner: Cold or Hot Runner • Gate: Pinpoint Gate or Edge Gate • Finish: Polish or Semi-matt |




Q1: Are you trading company or manufacturer ?
A1: We are factory.
Q2: Can I visit your factory?
A2: Yes! Warmly welcome to visit our factory. It would be Great if you can inform us in advance.
Q3:The quality of your products?
A3:The company has advanced production and testing equipment .Every products will be 100% inspected by our qc department before shipment
Q4:How about your price?
A4:High quality products with reasonable price. Please give me a inquire, I will quoted you a price for you refer at once.
Q5:Could you provide free samples?
A5:We can provide free samples for standard fastener, But the clients will pay the Express charges.
Q6: What's your Delivery Time?
A:Standard parts: 25-35days,Non-standard parts: 30-45days.We will make the delivery as soon as possible with the guarantee quality.
Q7: How should I order and make payment?
A7:By T/T, for samples 100% with the order; for production, 30% paid for deposit by T/T before production arrangement, the balance to be paid before shipment.