Venus Series High Conversion 150W All-in-One LED Solar Street Road Light Factory Production

Price $60.00 Compare
Min Order 10 Pieces
Shipping From Jiangsu, China
Popularity 290 people viewed
Quantity
+-
 

Yangzhou Huatai Lighting Group Co., Ltd

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
street light
Support After-Sales
3 Years
LED Lamp
Aluminum Alloy
Solar
Cool White
≥30W
Aluminum Alloy
12h
Lithium Iron Phosphate
6
Garden, Street
IP65
CE, RoHS, IP65
3-6V
With Light Source
14400-21600lm
60W-150W
10-12
CE,RoHS,IP65,IEC 62619,IEC 61215
HUATAI
Carton Packing
930*435*110 mm
China
9405409000
Product Description
Product Parameters
 

Product parameters

ModelAL-Venus 60AL-Venus 80AL-Venus 100AL-Venus 120AL-Venus 150
Solar Panel18V 60W18V 80W18V 100W18V 120W18V 150W
LED30303030303030303030
Fixture Watt60W80W100W120W150W
lumen(lm)960012800160001920024000
LiFePo4 battery12.8V 30AH12.8V 36AH12.8V 48AH12.8V 60AH12.8V 66AH
Outer carton size
L*W*H (mm)
Lamp:930*435*110 Sleeve:370*205*335Lamp:1170*435*110 Sleeve:370*205*335Lamp:1375*435*110 Sleeve:370*205*335Lamp:1480*435*110 Sleeve:370*205*335Lamp:1650*435*110 Sleeve:370*205*335
Spigot
(Φmm)
60-7660-7660-7660-7660-76
 

LED and Optical

brightness9600-24000lm
Irradiation angle80° × 150°
System Efficacy:150-160LM/M
color temperature2700K-6500K

solar panel
typeMONO Crystaline
capacity60W-150W

Operation Mode
By-time100%-4hrs,50%-2hrs, 25%-6hrs
By PIR sensor100% when the sensor is triggered, 25% after stand-by time 20s
By Time&PIR100% when the sensor istriggered, 25% after stand-by time 20s-4hrs; 50% when the sensor is triggered, 12.5% after stand-by time 20s-2hrs; 25% when the sensor is triggered, 6% after stand-by time 20s-6hrs.

Grade
Waterproof ratingIP65
Working temperature-20ºC-70ºC

Warranty
Standard3 years

Eligibility Criteria
certificateCE,ROHS,IP65,IEC 62619,IEC 61215

Product Description
Detailed Photos


Cases abroad


About Us

FAQ

Q:Can i have a sample order for led light?
A:Yes,we welcome sampl order to test and check quality.Mixed samples are acceptable.

Q:What about the lead time?
A:Sample needs 3-5 days,mass production time needs 1-2 weeks for order quantity more than 100sets.

Q:What should I do if I have a problem with my product?
A:In addition to man-made sabotage and natural disasters, we accept re-making for you!

Q:How do you ship the goods and how long does it take to arrive?
A:We usually ship by DHL,UPS,FedEx or TNT.It usually takes 3-5 days to arrive.Airline and sea shipping
   also optional.The steel pole since the length is too long.it has to be by sea.




























Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA