Versatile Steel Formwork System for Viaduct Projects

Price $1050.00 Compare
Min Order 1 Ton
Availability In Stock
Shipping From Beijing, China
Popularity 387 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System stands out for its remarkable strength and durability, making it an ideal choice for multiple reuses in construction. Easy to assemble and erect, this system is perfect for projects requiring a multitude of identical structures, such as high-rise buildings, roads, and bridges.
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We use different packaging methods for various products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallets: Small parts are packed in bags and then placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Depends on the destination charge port.
3. Special requirements may require negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two dedicated factories.

Q2: What do you specialize in?
A: We design and manufacture formwork products specifically forbridges and tunnels.

Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and accurate quotations to construction project owners, design institutes, or contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peer companies with our exceptional formwork products.

Q4: How long does it take to produce a preliminary design and quotation after we provide the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of products required.

Q6: What are your terms of payment?
A: We require a 30% T/T payment in advance, with the balance due before shipment.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$1050.00 1 Ton(MOQ)

Versatile Steel Formwork System for Viaduct Projects

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

High-Strength Large Infrastructure Steel Formwork

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Viaduct Column Steel Formwork with ODM/OEM Options

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Concrete Bridge Building Template Kit

Beijing Aoyu template Co., Ltd.
$10.00 1 Piece(MOQ)

High Quality Hunnebeck Topec Formwork System

RIZHAO JINHUA FORMWORK CO., LTD
$100.00 1 Square Meter(MOQ)

Light Weight Aluminum Formwork for High Rise Buildings by 6061-T6 Hot Sale

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
$6.90 10000 Meters(MOQ)

0.18mm Thickness Hy Rib Mesh as Concrete Permanent Assembly-Free Form Work

ANPING CHIYUN WIRE MESH MANUFACTURING CO., LTD
$9.89 500 Pieces(MOQ)

Manufacturer Construction Material H20 Timber Beam Timber Formwork H Beam for Concrete Pouring

Shandong Zeemo Construction Technology Co. Ltd.
$4999.00 1 Set(MOQ)

Robust Hydraulic Climbing System for Innovative High-Rise Projects Hydraulic Cylinder Lifting System Hydraulic Self Climbing System for Construction Machinery

Qingdao Jiuying Formwork & Scaffolding Co., Ltd.
$130.00 500 Square Meters(MOQ)

Steel and Aluminum Green Formwork for Slab Concrete

Qingdao Scaffolding Import and Export Co., Ltd.