Vh250 Vibro Hammer for Casing and Sheet Piling

Price $5000.00 Compare
Min Order 1 Set
Availability In Stock
Shipping From Jiangsu, China
Popularity 520 people viewed
Quantity
+-
 

Wuxi Eternal Bliss Alloy Casting & Forging Co., Ltd.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
EB2910
Vibration Piling Machine
Hydraulic Hammer
Electric
With Noise
CE, ISO 9001:2008
New
EB
Wooden Box
China
Product Description

Working Principle

Vibrating Pile hammer is using it's high frequency vibration to vibrate pile body with high accelertaion to pass the vertical
vibration of mechanical produce to pile which leading to changes in the soil structure around the pile,strength decrease.
Soil around the piles become liquefaction to reduce frictional resistance between side of the pile and soil. Then using the
excavator down force,vibrating the hammer and pile body weight to sink pile into the soil. When extracting piles,in the
condition ofvibration to pull out the pile by using excavator lift force.Excitation force needed by pile driving machinery
are comprehensive determined ny site soil,soil condition,moisture content and type of pile,construction.

Easy operation

Flexiable control

Silence operation

Easy maintenance

Precision design

Reliable performance

Quick Speed

Application Scope

The efficient of vibration pile method is higher than other methods. It is mainly applied to steel steet pile,steel pipe
pile and long slender concrete pecast pile within 8 -15 meters. This pile driving method is the most suitable for working
in sand and poorer effect in the clay which must select higher power model machines.

Product Parameters

 

Module

UNIT

VH250

VH330

VH350

VH450

Eccentric moment

NM

40

50

65

85

Frequency

RPM

2800

2800

2800

2800

Excitation Force

TON

36

45

58

75

Weight of Main Body

KG

1500

2200

2800

3500

Operation Pressure of oil system

BAR

280

280

300

300

Flow Demand for hydraulic oil system

LPM

155

168

210

255

Excavator

TON

18-25

30-40

40-50

40-65

Main Pile Length

M

9

13

16

18





Q: Are you trading company or manufacturer ? 
A: We are factory. 

Q: How long is your delivery time? 
A: Generally it is 5~10 days if the goods are in stock.Or it is 45 days if the goods are not in stock, it is according to quantity. 

Q: What is your terms of payment ? 
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shipment.
irrevocable LC at sight.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$688.00 1 Piece(MOQ)

EU Warehouse Powerful Dual Motor 85km/H 100km Foldable Scooters

Wuxi Eternal Bliss Alloy Casting & Forging Co., Ltd.
$220.00 1 Piece(MOQ)

New Electric Skateboard Price Suitable Quantity

Wuxi Eternal Bliss Alloy Casting & Forging Co., Ltd.
$1235.00 1 Piece(MOQ)

Cheap Price 2021 New High Power 5000W 8000W 72V Adult Electric Racing Motorcycle Dp with Long Range and High Speed for Sale

Wuxi Eternal Bliss Alloy Casting & Forging Co., Ltd.
$650.00 1 Piece(MOQ)

Cheaper High Speed Electric Scooter Disc Brakes 1000W 1500W

Wuxi Eternal Bliss Alloy Casting & Forging Co., Ltd.
$300000.00 1 Piece(MOQ)

Hkc35 Drilling Equipment Hydraulic Impact Pile Driver

Quanzhou Chengfeng Transmission Machinery Technology Co., Ltd
$80000.00 1 Piece(MOQ)

SDLQ LQR-80 Drill Rig 16.5T Weight1.2m Hole Diameter for Urban Shallow Piling

Shandong Liqiang Machinery Co., Ltd
$20000.00 1 Piece(MOQ)

S600 Hydraulic Sheet Pile Driver Vibro Hammer for 38-50 Ton Excavator

Yantai Juxiang Construction Machinery Co., Ltd
$12500.00 1 Piece(MOQ)

Reliable Construction Machinery Hydraulic Pile Hammer with Vibro Functionality

Yantai Juxiang Construction Machinery Co., Ltd
Negotiable 1 Piece(MOQ)

New Design Pile Driver with Hydraulic Hammer

Jiangyin Runye Heavy Industry Machinery Co.,Ltd.
$70000.00 1 Piece(MOQ)

Rotary Drilling Rig Sr155c Foundation Work Drilling Rig for Sale

Superegn Mechanical Engineering (Shanghai) Co., Ltd.