Viaduct Structural Column Steel Formwork System

Price $1050.00 Compare
Min Order 1 Ton
Availability In Stock
Shipping From Beijing, China
Popularity 367 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System is renowned for its strength and durability, offering unparalleled reusability in various construction projects. Its easy assembly and erection make it ideal for projects requiring consistent structures, such as high-rise buildings, roads, and bridges.
 

Packaging:

1. The total net weight for a loaded container is generally between 22 to 25 tons. Final confirmation is required before loading.
2. We use specialized packaging for different products to ensure safety and integrity:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are bagged and then placed on pallets for secure transport.
---Wooden cases: Available upon customer's request for additional protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: Typically, we require 20-30 days to complete production after receiving the customer's down payment for a full container.
2. Transportation: Delivery times depend on the destination port's charges.
3. Special requirements can be negotiated to meet specific needs.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two dedicated factories.

Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products used inbridges, tunnels, and other structural applications.

Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our products directly to contractors, building companies, material suppliers, and trading companies.
C: Our exceptional formwork products are also available to support our peers worldwide.

Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, manufacturing takes 30~60 days based on the type and quantity of products required.

Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance payable before shipment.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$1050.00 1 Ton(MOQ)

Steel Formwork for Adjustable Structural Column of Viaduct

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Viaduct Column Steel Formwork for Building Projects

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Adjustable Viaduct Column Steel Formwork

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Custom Steel Formwork for Adjustable Columns

Beijing Aoyu template Co., Ltd.
$130.00 1000 Square Meters(MOQ)

Aluminum Wall Shuttering Formwork Panel System for Construction Materials Manufacture

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
$10.00 1 Piece(MOQ)

safety Topec Prop Pin

RIZHAO JINHUA FORMWORK CO., LTD
$1499.00 50 Sets(MOQ)

China Lianggong Customized Reusable Steel Formwork Trench Box with Lower Price

Jiangsu Lianggong Construction Formwork Co., Ltd.
$999.00 1 Ton(MOQ)

Easy Scaffolding Building Material Concrete Column Steel Aluminum Plastic Panel Tunnel System Slab Prop Cone Accessories Steel Frame Formwork for Construction

Hunan INNO New Materials Technology Co., Ltd.
$10.00 500 Pieces(MOQ)

Lightweight Easy Installation PP Plastic Ventilation Construction Concrete Waffle Slab Disposable Formwork System for Building Construction

Suzhou Topo New Material Co., Ltd.
$175.00 100 Square Meters(MOQ)

China Manufacturer Cheap Skydeck Slab Aluminium Frame Concrete Formwork

YANCHENG LIANGGONG FORMWORK CO., LTD.