Washing Machine Parts of Aluminum Die Casting Parts

Price $1.50 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Zhejiang, China
Popularity 526 people viewed
Quantity
+-
 

Yuchen power transmission limited

VIP   Audited Supplier 9 years
Profile Certified by SGS/BV
  • Zhejiang, China
  • Emily Chen (Mr.)  
    Manager
6 inch
20kg
Automatic
Horizontal Type
Fixed
KaiHua
YC
Non-Fumigation
500mm*500mm*500mm
China
7610900000
Product Description
                               
   Products Discription data
Material &  Temper Aluminum Alloy ADC12 ,A380
Surface  TreamentMill-Finished,  Powder Coating,Polishing, Brushing, etc.
ColourShinning Polishing , powder coated as customer demand
Film  StandardPowder coating: 60-120 μm
Part Weightfrom 3 g --- 20kgs
  
ApplicationIndustry fittings and Construction and Decoration.
  
Casting  Machine  200-1200 tons 
Capability  Output 100 tons per month.
New Moulds  Opening new mould about 30 days .
Fabrication

  Die designing→Die making→Smelting&alloying→QC→Die casting→remove burrs

→QC→Surface treatment→QC→Packing→QC→Shipping→After Sale Service

 Deep  Processing  CNC / Cutting / Punching / Checking / Tapping / Drilling / Milling
  
Certification  1. ISO9001-2008/ISO 9001:2008;
  2. GB/T28001-2001(including all the standard of OHSAS18001:1999);
  3. GB/T24001-2004/ISO 14001:2004;
  4. GMC.
 MOQAs custimer's .  Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ.
  
 Free  Samples YES
 Payment  1. T/T: 30% deposite, the balance will be paid before delivery;
  2. L/C: the balance irrevocable L/C at sight.
 Delivery  time  1. 15 days production ;
  2. If opening mould, plus 10-20 days.
 OEM  Available.

 

Chemical Composition of Aluminum Alloy :

 AlloySiFeCuMnMgZnNiSnAl
ADC129.6-12.00.3-0.63.0-3.50.3-0.50.2-0.30.6-0.90.2-0.5<0.3Al
A3807.5-9.51.33.0-4.00.50.130.50.35Al

 
Products show

  

       

     

    Manufactury workshop
    

     
   
      

  FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment 30%TT in advance. 70% T/T before shippment

My name card

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$0.60 10 Pieces(MOQ)

CNC Cutting High Pricesion Musashi Dispenser Nozzle Sealant Bonding Needle Stainless Steel

Yuchen power transmission limited
$1.50 1 Piece(MOQ)

Washing Machine Parts of Aluminum Die Casting Parts

Yuchen power transmission limited
$10.00 1 Piece(MOQ)

Worm Gear Reducer RV50 with Double Shaft High Torque Speed Reducer Flange 56c Speed Reducer Gearbox Ratio 20-1 for Various Mechanical Equipment

Yuchen power transmission limited
$0.60 5 Meters(MOQ)

DIN Power Transmission Industry Carbon Steel Stainless Steel Roller a/B Series Heavy Conveyor Chain 08b\10b\12b\16b

Yuchen power transmission limited
$48.00 225 Pieces(MOQ)

Speed Sensor 7kg Top Loading Twin Tub Washing Machine for Clothes

Cixi Feilong International Trading Co.,Ltd
$12500.00 1 PIECE(MOQ)

8-16kg Dry Cleaning Machine Laundry Equipment Hotel Laundry Machine Commercial Laundry Machine Dry Cleaning Shop

Shanghai Xunduo Laundry Equipment Co., Ltd.
$3500.00 1 Piece(MOQ)

Washer and Dryer Coin Operated Commercial Laundry Machine for Sale

Wuxi Sharing Machinery Co., Ltd.
$800.00 1 Piece(MOQ)

Industrial Commercial Shoe Dryer Shoe Cleaning and Sterilizing Dryer Washing Machine Shoe

Guangdong Huashiwei Technology Industrial Co., Ltd
$3150.00 1 Set(MOQ)

High Capacity Low Noise Operation Powerful Motor Industrial Laundry Washing Machine

Shanghai Inchun Spinning & Weaving Clothing Equipment Co., Ltd.
$2500.00 1 Piece(MOQ)

Washing Machines Laundry Equipment Commercial Coin Operated Stack Washer and Dryer

Shanghai Huayi Washing Machinery Co., Ltd.