Waste Heat Steam Turbine Generator/ Driving Turbine for Pump/Fans/Energy Saving

Price $52100.00 Compare
Min Order 1 Set
Availability In Stock
Shipping From Shandong, China
Popularity 521 people viewed
Quantity
+-
 

Shandong Chenyang Power Technology Corporation Limited

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
B0.1-1.06/0.4
Global Service
12 Months
50-200kW
Alternator
AC Three Phase
CCC, ISO, CE, API
Standard
Pulse Type
Synchronous
Asynchronous
50Hz
60Hz
380/430
Waste Heat
Waste Heat Recovery Boiler
Energy Saving
CHENYANG
Sea Worht
50-500KW
China
8406811000
Product Description
COMPANY FROFILE
Chinese National High-tech Company
Financial Green Company
Chinese National Science and Technology Company
Shandong Province Gazelle Company
Qilu (Shandong Province) Science and Technology Edition Listed Company
(Stock Code 306017) 
- R&D and Training Center for Energy and Power Institute of Shandong University

BUSINESS SCOPE
Research and development of energy-saving equipment
Energy-saving technology
Design and manufacture of energy-saving systems
EPC projects

CHARACTERISTICS OF THIS SERIES STEAM TURBINE 
- SMALL SACLE STEAM TURBINE
- HEAT RESOURCE CAN BE WASTE HEAT FROM FACTORY
- ENERGY SAVING
- HIGH EFFICIECNY
- SPEED ADJUSTABLE
- With one Curtis wheel, with pitch circle diameter of 320mm.

- Electronic governor for speed control, 1500~9600r/min, and can be equipped with gear box for speed change.
- This series steam turbine is widely used for small capacity steam applications or education purpose.

TECHNICAL SPECIFICATIONS FOR SOME SAMPLES
ModelRated power (kW)Speed (r/min)Intake pressure (MPa)Intake temperature (ºC)Exhaust pressure (MPa)Steam consumption (t/h)
B0.03-0.8/0.123015000.83300.124
B0.075-2.35/0.37530002.354000.34.1
B0.1-2.35/0.210030002.353900.25
B0.05-1.6/0.155030001.62800.153
B0.06-0.98/0.26030000.982500.23.3

NOTE:
1. Can be customized according to specific reuirements.
2. The intake and exhaust pressure is absolute pressure.


SUCCESSFUL PROJECTS PRESENTATION
USER: FOR POWER PLANT WASTE HEAT RECOVERY GENERATION

MODEL: B0.1-1.06/0.4
POWER: 100KW
INTAKE PRESSURE:1.06MPa
EXHAUST PRESSURE: 0.4MPa
GENERATOR: ASYNCHRONOUS GENERATOR




  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$86880.00 1 Set(MOQ)

EPC Project for Waste Heat Recovery Power Generation/ Steam Turbine Generator

Shandong Chenyang Power Technology Corporation Limited
$76880.00 1 Set(MOQ)

C90 Series Single Stage Back Pressure Steam Turbine

Shandong Chenyang Power Technology Corporation Limited
$76880.00 1 Set(MOQ)

Steam Turbine Synchronous Generator Project

Shandong Chenyang Power Technology Corporation Limited
$108100.00 1 Set(MOQ)

Biomass Power Plant/EPC/Cogeneration CHP/Hrsg/Steam Turbine Generator/Coal Power Plant

Shandong Chenyang Power Technology Corporation Limited
$108100.00 1 Set(MOQ)

EPC Power Plant/Hrsg/CHP/Cogeneration/Steam Turbine Generator/Synchronous/Asynchronous Generator

Shandong Chenyang Power Technology Corporation Limited
$19899.00 1 sets(MOQ)

5MW_10MW Long Lifespan Low Maintenance Cost Condensing Steam Turbine for Power Plant

Zbgreat Imp&exp Co., Ltd.
$3000000.00 1 Piece(MOQ)

C55extraction Condensing Industrial Steam Turbine Generator

Anhui Zhengyufeng Energy Saving Technology Co., Ltd.
$100000.00 1 Piece(MOQ)

High-Efficiency Back Pressure Steam Turbine for Power Generation (T580)

Zibo Renao Steam Turbine Co., Ltd.
$99999.99 1 Piece(MOQ)

Modular Design Energy Cascade Utilization Steam Turbine Generator Excellent Jtl

Jin Tong Ling Technology Group Co., Ltd.
$3000000.00 1 Piece(MOQ)

B7.5high-Efficiency Back-Pressure Steam Turbine Generator Sets for Industrial Applications

Anhui Zhengyufeng Energy Saving Technology Co., Ltd.