for Refrigeration Compressor Piston Assembly Ge

Price $9.20 Compare
Min Order 1 sets
Availability In Stock
Shipping From Zhejiang, China
Popularity 375 people viewed
Quantity
+-
 

Ningbo Kebang Mechanical Parts Co., Ltd

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
GE
Direct Cooling
New
Piston Assembly
Aluminium
75.0(Std)X18.0-Cr1.5-P1.5-200559
4ge-20
Kebang
1
One Months
3-7days
Provided
Machinery Repair Shops, Manufacturing Plant
Ts16949
Available
KEBANG
Cartons
see the product details
Zhejiang, China
Product Description


COMPANY PROFILE 
   Ningbo Kebang Mechanical Parts Company is a professional manufacturer and exporter in linesof refrigeration and air compressor.
It is located in Ningbo,zhejiang,China.
   We provide a range of replacement parts for semi-hermetic 
compressors, including piston assembly sets , connecting rod bushings,valve plates, reeds,crankshafts,oil pumps, oil filters,gasket
and so on. Besides compressor parts, we can also supply compressors, condensers, and air coolers.we also can make products
according to your drawings or samples.
    With a large inventory, we can provide low minimum order quantities
and quick delivery time.As we have our own factory ,we are able to closely monitor the quality of our products to meet OEM standards. We
have professional team to offer you technology support to speed up your processes. Our goal is to offer a "one-stop shopping" service to meet your needs and lower your cost.
    Basing on company philosophy of Quality Oriented and honest to customers, we welcome customers from all over the world visit our company and build up a long-term cooperation relationship.


for Refrigeration Compressor piston assembly GE

Product name
for Refrigeration Compressor piston assembly GE
Model Number4GE-20
Size75.0(std)x18.0-Cr1.5-P1.5-200559
OEM,ODM      available
Sample Lead Time      3-7days
Material      steel
Application

         refrigerator compressor spare parts

Sample price       samples, freight should be paid by the buyer

 





Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-40 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.

 

 

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$11.80 1 sets(MOQ)

Refrigeration Compressor Spares Parts Piston Rod Assembly J

Ningbo Kebang Mechanical Parts Co., Ltd
$44.10 1 sets(MOQ)

Different Valve Plates for Refrigeration Spare Parts for Copeland 61.9 Valve Plate Kit D3d 3s

Ningbo Kebang Mechanical Parts Co., Ltd
$40.42 1 sets(MOQ)

Wholesale Paper Gasket Compressor Refrigerator Parts Gasket Kit Z30-102

Ningbo Kebang Mechanical Parts Co., Ltd
$44.10 1 sets(MOQ)

Refrigeration Compressor Spare Parts for Carrier Compressor Carrier Terminal Blocks Kit 06e

Ningbo Kebang Mechanical Parts Co., Ltd
$20000.00 1 Piece(MOQ)

Washing Machine Test Laboratory

GZ-LANS EXPERIMENTAL TECHNOLOGY CO.,LTD
$20.00 100 Pieces(MOQ)

Copper Refrigeration Pipe Access Valve Air Conditioner Part Copper Fitting

Zhejiang Jiangxin Copper Pipeline Co., Ltd.
$5000.00 1 Piece(MOQ)

Refrigeration System Air Cooled Condenser Unit for Cold Room Outdoor

Zhejiang Damai Cold Chain Equipment Co., Ltd.
$8000.00 1 Piece(MOQ)

Condensing Unit Box Type for Sale Cold Room Refrigeration Unit

Fujian KKD Refrigeration Equipment Co., Ltd.
$300000.00 1 Set(MOQ)

Psychrometric Air Conditioner Performance Test Equipment

GZ-LANS EXPERIMENTAL TECHNOLOGY CO.,LTD
$200.00 1 Piece(MOQ)

Refrigerant Air Dryer (MD-20AC)

Dongguan Shengguang Industrial Equipment Co., Ltd.