$55.00
300 Square Meters (MOQ)
Super Light Plastic Formwork for Shuttering
CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
Swipe or use the arrows to view product images.
Adjustable Steel Formwork for Structural Columns
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 357 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Info.
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is renowned for its strength and durability, making it a reusable solution for numerous construction projects. This formwork is designed for easy assembly and erection, ensuring efficiency on site. With a fixed shape and structure, it is particularly ideal for projects requiring repetitive shapes such as high-rise buildings, roads, bridges, and more.Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, and this must be confirmed prior to loading.2. Various packaging methods are employed for different products:
---Bundles: Suitable for items like timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container order, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two of our own factories.
Q2: What do you specialize in?
A: We design and manufacture formwork products specifically forbridges and tunnels.
Q3: What services do you offer?
A: We provide our clients, including project owners, design institutes, or contractors, with expert suggestions, formwork layout drawings, and detailed quotations.
B: We sell our top-quality products to contractors, building companies, material suppliers, and trading firms.
C: We also support our global peers by supplying them with our superior formwork products.
Q4: How long does it take to create a brief design and quote after receiving the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of the products to be produced.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.
- Similar Products
$0.19
5000 Pieces (MOQ)
27mm Plywood Shuttering Panels Metal Flat Tie Formwork Spacers
Hebei Trico Trade Co., Ltd.
$140.00
100 Square Meters (MOQ)
Quick Release Drop Head Aluminum Concrete Slab Formwork Building Construction Building Material
Kitsen Technologies Co., Ltd.
$31.70
200 Pieces (MOQ)
High Density PVC Plastic Formwork 4*8 Board
Henan Lanke Plastic Profiles Co., Ltd.
$40.00
200 Pieces (MOQ)
Reusable Plastic Formwork for Concrete Walls
Zhanjiang Kingstar Building Material Co., Ltd.