Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work

Price $6000.00
Min Order 20 Tons
Availability In Stock
Shipping From Jiangsu, China
Popularity 376 people viewed
Model NO.:
YYRS
Material:
Aluminium
Type:
Mobile
Structural Style:
Tower Scaffolding
Framework:
Combined Scaffolding
Supporting Mode:
Floor Type Scaffolding
Lapping Form:
Full Scaffolding
Erection Position:
External Scaffolding
Move Method:
Attached Lifting Scaffolding
Scaffolding Part Type:
Scaffolding System
Construction Properties:
Installation Scaffold
Surface:
Hot Dipped Galvanized
Certification:
En12811
Style:
Aluminium Scaffolding Tower
Power Source:
Manual
Trademark:
Yue Yang
Transport Package:
Pallet
Specification:
Ringlock System
Origin:
Jiangsu, China
HS Code:
7308400000
Product Description
Aluminium Cuplock Ringlock Scaffolding System for Aerial Work Construction
 

Product Description

 
1-High Grade Aluminium takes heavy loading capacity, get to 4.4kN.

2-Light Weight makes high work effective.

3-Special design for aerial using, easy installation, less labour force, economic cost.

4-More items for more possibilities.

5-Aluminium ringlock scaffolding tower and more sizes can be customized.

6-
Sample Model left: 5m(H)X2.07m(L)X1.40m(W)

 

 

Detailed Photos

Detailed Photos of Ringlock Scaffolding System
 

Installation Process

Installation Details of Ringlock Scaffolding System

Put adjustable base jack on the ground, followed by the base collars, with the thinner tube downwards onto the adjustable base jack.   The recommended height for the adjustable base jack extension is 20 cm. Begin erecting at the ground's highest point. In the first bay connect the single ledger (A)m and single ledgers (B)m to the small holes of the base collars. Check the assembled frame and ensure that it is level and square.
Note: Anchor the base jack to the ground.



Place the standards 2.0m over the adjustable base jack onto the base collars.    Install the second floor single ledgers at a 2m height (4 rosette spacings). The specifications of Single ledgers follow the first floor bays.


Put the stairway to the section you want at the 2.0m height.  Install the diagonal bracing according to plan.Meanwhile, secure all the wedges of single ledgers and diagonal braces with hammer.


Install the internal handrail on to stair way.Installing the plank beside the stairway. Lock the planks to the single ledgers with the lock plate at the back of planks.


Repeat the step 1-4 for upper section install.TIP: When putting the standards on top of each other, turn them so that they can(if necessary) be connected to one another with locking pins.  Install the second stairway from the second floor to third foor. Repeat the step 5-6 to install the handrail and planks.Flow up with others parts as plan if have customize design.
 

Packaging & Shipping

Packing & Shipping of Ringlock Scaffolding System

Product process of Ringlock Scaffolding System

Company Profile

Company Profile



 

  • Similar Products
Full Page Contact Supplier