Swipe or use the arrows to view product images.
Authentic Makino Round Guide for Precision Machining Applications
| Price | $850.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 304 people viewed |
Model NO.:
33EC085A107
After-sales Service:
All The Lift-Time of Machine
Warranty:
1year
Logo Printing:
with Logo Printing
Size:
Small
Customized:
Non-Customized
Type:
Base
Material:
Metal
Certification:
ISO 9001:2008, GS, CE
Remark:
Suitable for φ0.25mm Wire Diameter
Replacement Cycle:
1-3 Per Year
Customize or Not:
No
Diamond:
±0.001mm
Trademark:
skeye
Transport Package:
The Machine Will Be Packed by The Plywood Case
Specification:
Standard size
Origin:
China
HS Code:
845710
Product Description
Makino original circular precision wire guide
Imported diamond
Strong and durable, small error
Using high-end diamond raw materials, high hardness zirconia ceramics, developed by high precision equipment
·Excellent finish
·High wear resistance
Q1. Are you a manufacturer or a trading company?
We are a professional CNC equipment company enterprise, and have fittings and accessories. We warmly welcome you to visit our factory.
Q2, Do you accept OEM brands?
Yes, we have OEM service, we have rich OEM experience.
Q3. Are there any samples for quality testing?
Our company does not have samples of auxiliary materials
Q4. Do you have any certificates?
Yes, we have BSCI, ISO, FSC, MPA certificates.
Q5. How do you guarantee quality?
Product quality is the basis of good customer service. On the one hand, we adhere to innovation, the introduction of excellent talents, equipment and technology, fully achieve product quality to meet customer needs, on the other hand, the use of advanced management methods, especially quality inspection management.
Q6. What are your payment terms?
Telegraphic transfer 30% as deposit, 70% before delivery, different amounts determine different payment methods. Before you pay the balance, we will show you photos of the products and packaging.
Q7. What's your delivery time?
Generally, it takes 15 to 40 working days after receiving your advance payment. But the exact delivery time depends on the goods and quantity you order.
Imported diamond
Strong and durable, small error
| Part number | 33EC085A107 | 33EC095A107 |
| Part name | Round guide (φ0.25mm) | Round guide (dia.0.25mm) |
| remark | Suitable for φ0.25mm wire diameter | Suitable for φ0.25mm wire diameter |
| use | For the nose of the machine | For off the nose |
| peculiarity | Must be replaced according to the wire diameter used | Must be replaced according to the wire diameter used |
| Usage method | Use 1 on the upper nose | Use 1 off the nose |
| Replacement cycle | 1-3 per year | 1-3 per year |
Imported D-grade diamond, 37 degree optical section, accuracy error ±0.001mm
Import D class precision error
Diamond ±0.001mm
Import D class precision error
Diamond ±0.001mm
Using high-end diamond raw materials, high hardness zirconia ceramics, developed by high precision equipment
·Excellent finish
·High wear resistance
·Excellent finish
·High wear resistance
Using high-end diamond raw materials, high hardness zirconia ceramics, developed by high precision equipment
·Excellent finish
·High wear resistance
Q1. Are you a manufacturer or a trading company?
We are a professional CNC equipment company enterprise, and have fittings and accessories. We warmly welcome you to visit our factory.
Q2, Do you accept OEM brands?
Yes, we have OEM service, we have rich OEM experience.
Q3. Are there any samples for quality testing?
Our company does not have samples of auxiliary materials
Q4. Do you have any certificates?
Yes, we have BSCI, ISO, FSC, MPA certificates.
Q5. How do you guarantee quality?
Product quality is the basis of good customer service. On the one hand, we adhere to innovation, the introduction of excellent talents, equipment and technology, fully achieve product quality to meet customer needs, on the other hand, the use of advanced management methods, especially quality inspection management.
Q6. What are your payment terms?
Telegraphic transfer 30% as deposit, 70% before delivery, different amounts determine different payment methods. Before you pay the balance, we will show you photos of the products and packaging.
Q7. What's your delivery time?
Generally, it takes 15 to 40 working days after receiving your advance payment. But the exact delivery time depends on the goods and quantity you order.
- Similar Products
Negotiable
1 Piece (MOQ)
Hydraulic Feeder for 3-28mm Bar in CNC Machining Center
Dongguan Langshuo Automation Technology Co., Ltd