Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Collet Er11/16/20/25/32/40 for Milling Spring Steel Clamp Chuck Bt46 Er40 Collet Set

Price $8.00
Min Order 1 Piece
Availability In Stock
Shipping From Guangdong, China
Popularity 311 people viewed
Model NO.:
ER40
After-sales Service:
Provided
Warranty:
3 Months
Logo Printing:
Without Logo Printing
Size:
Large
Customized:
Non-Customized
Type:
Universal
Material:
Metal
Certification:
ISO 9001: 2015
Tolerance:
0.003mm~0.008mm
Specifications:
Er08/Er11/Er16/Er20/Er25/Er32
Optaional Material:
Spring Steel
Machine Type:
Milling Machine
Clamping Range:
3.0mm-20.0mm
Trademark:
Insight
Transport Package:
Plastic Box Inside and Carton Box Outside
Specification:
ER40
Origin:
Guangdong
HS Code:
8207709000
Product Description
 
Product Description


ER Spring Collet Chuck Specifications
Order No.DD1LL1L2
ER088.506.5013.501.501.20
ER1111.509..5018.002.502.00
ER1617.0012.8027.504.002.70
ER2021.0017.4031.504.802.80
ER2526.0022.0034.005.003.10
ER3233.0029.2040.005.503.60

                                                                     
                                                                      ER 40 Collets


Detailed Photos








Product Details

Company Profile


Packaging & Shipping
 

FAQ

  Q1: Are you a factory or trading company? 
  A1: We are professional manufacturer,have more than 14 years experience in this industry. Welcome to visit us!

  Q2: Do you produce special cutting tools?
  A2: Yes, we provide OEM/ODM service for customers, just send us your design drawings if you have any customized items need
         to be made. 

  Q3: Do you accept low volume for sample order? And what's your MOQ for special tools?
  A3: Yes, our MOQ is 1 piece, and the sample lead time is 3 days. It can be negotiated for special requirement.

  Q4: If we want to work with you, is it possible to get confidentiality?
  A4: Sure, all your information including company info, drawings, PO details will be kept confidential, we can signed non-disclosure
        agreement.

  Q5: How long of the lead time?
  A5: for standrad items we have in stock, the lead time is within 3 days. 
        for non-standrad items need to be customized made, the lead time is within 7-15 days.

  Q6: Is free shipping possible?
  A6: We don't offer free shipping service,but we will give you some discount if you buy large quantity products. 
       We have discount on shipping cost from our courier companies,can offer you the cheapst shipping cost. 
 
  • Similar Products
Full Page Contact Supplier