$56.69
100 Square Meters (MOQ)
Concrete PVC Plastic Building Formwork for Construction Internal Angle
Hebei Leige Technology Development Co., Ltd.
Swipe or use the arrows to view product images.
Custom Steel Formwork for Adjustable Columns
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 510 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Info.
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system is the epitome of strength and durability, making it a perfect choice for reusable applications in construction. Its ease of assembly and erection, coupled with a fixed shape and structure, renders it ideal for projects requiring multiple identical structures, such as high-rise buildings, roads, and bridges.Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons, subject to confirmation prior to loading.2. We employ various packaging methods tailored to different products:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged before being placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Certain irregular items are loaded in bulk within the container.
Delivery:
1. Production: For a full container, standard production time is 20-30 days following receipt of the customer's down payment.
2. Transportation: The duration depends on the destination charge port.
3. Special requirements can be negotiated as needed.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a specialized stencil-making company, operating out of two dedicated factories.
Q2: What is your main business?
A: We excel in designing and manufacturing formwork products specifically forbridges and tunnels.
Q3: What services do you offer?
A: We provide valuable suggestions, detailed formwork layout drawings, and competitive quotations for construction projects to owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peers by supplying them with our exceptional formwork products.
Q4: How long does it take to draft a preliminary design and quotation after we submit structural drawings?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of the products ordered.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.
- Similar Products
$200.00
800 Square Meters (MOQ)
Fast and Efficient Heavy Duty Aluminum Concrete Wall Formwork Versatile for Any Requirements
Kitsen Technologies Co., Ltd.
$49.90
100 Pieces (MOQ)
Symons Forms Concrete Steel-Ply Forming System Steel Ply Forms 2'x8'
Hebei Trico Trade Co., Ltd.
$0.19
5000 Pieces (MOQ)
Formwork Accessories Iron Spacers for Wooden Panels
Hebei Trico Trade Co., Ltd.