Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Factory Directly 4 Burner Outdoor Steel Folding Trolley BBQ Gas Grill

Price $135.36
Min Order 300 pieces
Availability In Stock
Shipping From Guangdong, China
Popularity 247 people viewed
Model NO.:
HF2615AS-4
Metal Type:
Steel
Feature:
Easily Assembled
Safety Device:
Flame Safety Device
Certification:
ITS, GS, EMC, CE, AGA, CCC
Grill Type:
Gas Grills
Finishing:
Power Coated
Description:
Garden Supplies
Loading Qty.(40'hq):
340PCS
Item No.:
Hf2615as-4
Product Name:
BBQ Outdoor Grill
Production Lead Time:
30 to 45 Days
CE Cert. No.(Pin):
0063CS7068
Style:
Popular
Sample Availability:
Yes
Application:
Home.Outdoor BBQ
Power:
3.1kw (10500BTU)
Trademark:
private label, HF
Transport Package:
Standard Export Package
Specification:
129 x 57.5 x 108.5cm
Origin:
Guangdong, China
Product Description
 
Product Description

 

Point of Sales (POS):

- Heavy double layer hood

- Foldable Side Shelf
- Cast iron grid with LFGB

- Big grease box
- High quality, durable
- Easy Assembly

Description
4 burner gas grill with side burner
Main Material 
Cold Rolled Steel
Product dimension
129 x 57.5 x 108.5cm
Surface treatment
Powder coating, Enamel Coating
Cooking area
390sqin
Fuel Type
Butane, Propane, LPG
Burner
Stainless Steel Tube Burner
Packing style
SKD, 0.199CBM, 1pc/CTN
No. of burner
5
Loading qty.(40'HQ)
298pcs
CE Cert. No.(PIN)
0063CS7068
Loading port
Yantian, China
Factory Certificates
BSCI, ISO9001
Production Lead Time
30 days for 1st shipment
Recommend Products
 
 
 
Company Profile
 
WORKSHOP
PRODUCTION LINE
 
FAQ
Q1: Are you a factory or a trading company?
A1: We are a manufacturer with more than 12 years' experience in producing charcoal grills, gas grills, kerosene heater and BBQ accessories with OEM & ODM projects. We've been exporting to over 30 counties with the main market Europe and North America.

Q2: Can we have your samples?
A2: Yes, sample fee will be charged and it could be refunded once the formal order is confirmed.

Q3: How long for sampling?
A3: Usually it takes 3-7 days. For customized samples with new moulds it may takes 30 days.

Q4: What's the lead time for mass production?
A4: Usually it takes 30-45 days upon order confirmation.

Q5: What's the MOQ?
A5: The MOQ for each item is based on the quantity loaded with 1×40HQ container. Usually it may be 300-600pcs according to the packaging volume.

Q6: Where is your company?
A6: Our company is located in Guangzhou, Guangdong.Only 15 minutes away from Guangzhou New Baiyun Airport.

 
Q7: How many staff in your company?
A7: There are about 200 staff including 7 R&D engineers and 130 skilled workers in our company.
  • Similar Products
Full Page Contact Supplier