Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

For Concrete Roof Repair Sbs Modified Bituminous Asphalt Waterproofing Membrane

Price $4.00
Min Order 2000 Square Meters
Availability In Stock
Shipping From Hubei, China
Popularity 449 people viewed
Model NO.:
SBS-EL
Width:
1m
Length(M):
10m
Type:
Waterproof Roll Material
Function:
Waterproof
Material:
Modified Bitumen
Surface Layer:
PE Film,Mineral Particles(Sanded Type)
Reinforcement:
Py Polyester Tire
Heat Resistance:
90ºC-105ºC
Low Temperature Flexibility:
-25ºC--20ºC
Water Permeability 30min:
0.3MPa
Certificate:
ISO9000/ISO4000/ISO45001
Tensile Force:
Maximum/(N/50mm)≥≥500n/50mm
Elongation Rate:
≥30%
Trademark:
JUYONS
Transport Package:
Pallet Transport
Specification:
3mm, 4mm
Origin:
Hubei Province, China
Product Description
For Concrete Roof Repair SBS Modified Bituminous Asphalt Waterproofing Membrane






PRODUCT FEATURES:
1.With strongimpermeability.
2. High tensile strength, large elongation, good dimensional stability, and strong adaptability to shrinkage,deformation and crackingof the base layer.
3. Good resistance to high and low temperatures, suitable for building waterproofing in lower
temperatureenvironments.
4. Good puncture resistance, tear resistance, corrosion resistance, mildew resistance, andweatherresistance.
5. Hot melt construction method is easy operation, can provide reliable and durable hot joints.


APPLICATIONINSTRUCTIONS:
1. Surface Preparation: Check the flatness of the base layer and clean it well to ensure that the base layer is dry, solid,smooth and clean.
2. Priming: Apply asphalt base treatment agent by roller or brush, at a dosage of0.3KG per square meter.
3. Membranes Paving: use hot melt torch to heat the lower surface ofthe membranes until it is molten, and at the sametime roll the upper surface with a roller to paste the membranes on the base layer.
4. Membranes Overlap: The membranes should be smooth and straight paving, and accurately position succeedingsheets to overlapthe previoussheet100mm.
5. inspection: After the construction of the waterproof layer is completed, wait for 24 hours to do the water storageexperiment. The next process can be carried out after checking that there is no water leakage.

APPLICATION:
It is most suitable for roofing work,and can also be used for structural waterproofing of underground works, as well aswaterproofing ofthe ground, moisture-proof works, and outside waterproofing of pools and swimming pools.



  • Similar Products
Full Page Contact Supplier