Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Gorvia 700ml Fast Dry Rubber Leak-Stopping Leak Sealer

Price $0.98
Min Order 5000 Pieces
Availability In Stock
Shipping From Shanghai, China
Popularity 419 people viewed
Model NO.:
L311
CAS No.:
7085-85-0
EINECS:
230-391-5
Color:
Black
Appearance:
Powder
Main Raw Material:
Polyurethane
Method:
Spray
Level:
Finish Coat
Drying Method:
Air Drying
Certification:
ISO9001
Substrate:
Steel
Components:
Pigment
Formation Mechanism:
Conversion Type
Packing:
24PCS/CTN
MOQ:
10500PCS
OEM:
Acceptable
Shelf Life:
12 Months
Curing Time:
24 Hours
Trademark:
GORVIA
Transport Package:
Carton
Specification:
700ml
Origin:
China
HS Code:
3506919090
Product Description
Product Description

GORVIA L311 Leak Sealer

GORVIA ®L311 Leak Sealer is specially designed to repair the leakage of tube root, pipe orifice, pipe corner, cracks, slot wiring, pipe joints, etc. It is easy to reach the place hard to brush or wrap. It has the features of anti corrosion and rust proof, fast dry,. It is compliable to many different materials and hard surfaces such as concrete, plastic, steel, iron, etc.

Name

Leak Sealer

Brand

GORVIA

Color

Black/Grey/White/Transparent

ApplicationConstruction;Household
Volume

450/650/700ML

Packing

24pcs/ctn

MOQ2400pcs
Shelf Life12 Months
OEMAvailable
Application

Leak Sealer is ideal for either general maintenace or emergency repairs on roofs, drip pans,swamp coolers, cooling towers, gutters, downspouts, flashing, PVC drainage pipe, ductwork, pipes, hoses etc.

Feature

Suitable for waterproofing on various base surfaces and can be constructed in all seasons.

 

It cures into a film, which is waterproof and anti-penetration, does not crack or peel, and the effect is excellent.

 

High and low temperature resistant, waterproof and foam resistant, strong flexibility.

 

Instruction

1.Clean the base surface: remove dust and sundries on the surface and keep the base surface clean;

2.Treatment of large cracks: if the gap is more than 5cm, apply glass fiber to cover it before construction;

3.Construction method: shake the bottle in front, spray evenly, and spray again after one hour;

4.Waiting for curing: The drying time of the table is 20-30 minutes, and the curing time is about 24 hours.

Packaging & Shipping
Delivery Time: about 25 days
Payment Term:
T/T 30% advance payment, clear the balance against B/L scan copy
T/T 30% advance payment, clear the balance upon notification that the goods are ready for dispatch
T/T 30% advance payment, clear the balance within 7 working days after scan copy of B/L
FAQ

  • Similar Products
Full Page Contact Supplier