Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Automatic Metal Steel Wire Clothes Hanger Making Machine

Price $7500.00
Min Order 1 Piece
Availability In Stock
Shipping From Jiangsu, China
Popularity 392 people viewed
Model NO.:
custom
After-sales Service:
Support
Automatic Grade:
Automatic
Warranty:
1 Year
Certification:
CE
Voltage:
380/220V
Certificate:
CE
Product Name:
Wire Hanger Making Machine
Weight:
700kgs
Speed:
35-45PCS/Min
Size:
2.2cbm
Final Product:
Cloth Hanger
Trademark:
HANXIN
Transport Package:
Wooden Box
Origin:
China
HS Code:
8463300000
Product Description
Product Description
ModelSL-400
Capacity35-40pcs/minute
Wire diameterCustomize
Voltage220V/380V
Hanger sizeCustomize
Net weight700KG
Machine Size1800*800*1650mm

 

Features

1. Automatic hanger fabrication with higher capacity

2. Automatic detecting sensor for emergency stop

3. Easy operation and simple maintenance

4. Durable dies and lower operation cost

 
Company Profile

Suzhou Hanxin Machinery Equipment Co. LTD Founded in March 2011,Our company specializing in the production of resistance spot welding machine & wire forming machine more than 10 years,our company is located in the beautiful jiangnan water township - Suzhou Yangcheng Lake Town, the factory covers an area of more than 1000 square meters;To company development, cultivate a group of professional technical research and development and production team, the company adhere to customer first, the principle of starting from the actual, clinch a deal from the product sample to equipment shipped to the customer factory use the link, have the specialist tracking report, after-sale tracking service 24 hours by a professional team, troubleshoot customer usage problems



 
Packaging & Shipping

 
FAQ

 


1. Q: What is the power supply of the machine? 
  A:  The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.

2. Q: What information should the customer provide to get an accurate quotation from us? 
  A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc 

3. Q: What is the payment term     

  A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other  payment term,  like L/C, DA, D/P etc
4. Q: What is the delivery time?
  A: Normally the delivery time of the machine is 30 days after receive down payment. 

5. Q: What is the warrantee period of the machine?
  A: The warrantee period is one year since the date of B/L.



  • Similar Products
Full Page Contact Supplier