Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

High-Quality Workshop Steel Structure Carbon Steel Aluminum Grade Warehouse Building: Durable, Customizable, and Cost-Effective Solutions for Industrial

Price $1400.00
Min Order 5 Tons
Availability In Stock
Shipping From Anhui, China
Popularity 522 people viewed
Model NO.:
steel structure
After-sales Service:
Customer Service Tracking
Connection Form:
Welded Connection
Construction Member:
Steel Column
Grade:
Carbon Structural Steel
Molding Method:
Hot-Rolled Steel
Residential Wall Structure:
Top Wall Beam
Standard:
BS
Steel Type:
High-Strength Steel
Structure:
Steel Structure
Staple:
Q235B,Q355b
Columns and Beams:
Walded and Hot Rolled H Section
Surface Treatment:
Hot-Dipped Galvanized, Anti-Rust Painting
Purlins and Keels:
Cold Rolled C or Z Steel, Q355,Q235
Trademark:
Honglu
Transport Package:
as Per Customer's Reguirement
Specification:
Based on customer needs
Origin:
Hefei China
HS Code:
9406000090
Product Description

Product Description

 

 

Company Profile

 

Packaging & Shipping

 

FAQ

 

Are you a trading company or a manufacturer?
We are a group company and factory focusing on steel structure manufacturing. As a leading steel structure enterprise in China, we operate large-scale manufacturing bases in Hefei, Wuhan, Jinzhai, Chongqing, and Guoyang, covering an area of more than 5 million square meters.

What are your main products and annual production capacity?
Our main products include steel structures, steel cladding and enclosure systems, welding wires, and intelligent welding robots, with an annual production capacity of over 6 million tons of steel structures.

Can you provide design services?
Yes, we also offer comprehensive design services tailored to your unique needs.

What are the payment terms?
a) 30% T/T deposit in advance, with the balance paid before shipment or against the BL copy.
b) 100% L/C at sight is also available for your convenience.

What is the lead time?
The delivery time depends on the order quantity. Generally, it takes around one month after receiving the deposit.


  • Similar Products
Full Page Contact Supplier