Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

PP Woven Bag Flour Bag Making Machine

Price $100000.00
Min Order 1 Piece
Availability In Stock
Shipping From Zhejiang, China
Popularity 288 people viewed
Model NO.:
ZD-SCD-1200*800
After-sales Service:
Support
Warranty:
1 Year
Product Line:
Support
Lines:
1
Voltage:
220V
Speed:
Medium
Continuous-Rolled:
No
Sealing & Cutting:
String
Layer:
Single
Machine Type:
Sealing Machine
Computerized:
Computerized
Type:
Non-Woven Bag Making Machine
Cutiting Length:
600-1200mm
Max Cutting Width:
800mm
Stitch Range:
3.6-8mm
Max Dia.of Fabric Roller:
1200mm
Folding Width:
20-30mm
Gross Power:
6kw
Cutting Presicion:
±1.5mm
Production Capability(PCS/M):
30-40PCS/Min
Weight:
About 2200kg
Trademark:
zhuding
Transport Package:
Wooden
Specification:
5600*1800*1200mm
Origin:
Zhejiang
Product Description
Functions of equipment
 ModelQL-SCD-45
Max.fabric width800mm
Cutting length560-1300mm
Cutting accruacy± 1.5mm
Sewing speed20-40pcs/min
Stitch range3.6-8mm
 Folding width15-25mm

 1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)
 
2. Q:How many days will you finish installing ?
A:We will finish installation and training within 15 days.
 
3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
 
4. Q:How long is your machine's warranty period?
A: All our machine have half a years guarantee for electricity parts and one years
guarantee for mechanism, starting from finished installation.
 
5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.
 
6. Q:How could you do after one year warranty period?
A:We also can do service for you, but you need pay
salary for our technicians 80USD/day for each person.
 
7. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.
 
8. Q:Can you help us find any engineer in our location?
A:Of course, we will check and inform you as soon as possible.
 
9. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
  • Similar Products
Full Page Contact Supplier