Swipe or use the arrows to view product images.
Premium Magnesium Oxide Paste Resin for Industrial Applications, SMC or Cipp Thicken, MGO Paste
| Price | $10.00 |
|---|---|
| Min Order | 1000 kg |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 265 people viewed |
Molecular Principal Chain:
Carbon Chain Polymer
Viscosity at 25ºC:
1000-20000MPa.S
Special Gravity at 25ºC(g/cm3):
1.6-1.7
Active Ingredients:
25-35%
Flash:
Above. 70ºC
Package:
20kg, 50kg, 200kg with Open Drum
Trademark:
Promisechem
Specification:
paste
Origin:
Changzhou China
Product Description
Magnesium oxide paste resin
Description
- Thicken paste.unsaturated polyester resin mixed with MgO.
- Medium reactive with styrene free.
Application
- Thicken for SMC,BMC and CIPP formulations
Shelf life
- 6months away from sunlight and heat resource.
Paste Storage
- The resin should be stored indoors as the original,unopened and undamaged packaging, a dry space.Be sure store in the dark without cotact between the resin and the daylight.
- Thicken paste.unsaturated polyester resin mixed with MgO.
- Medium reactive with styrene free.
Application
- Thicken for SMC,BMC and CIPP formulations
Shelf life
- 6months away from sunlight and heat resource.
Paste Storage
- The resin should be stored indoors as the original,unopened and undamaged packaging, a dry space.Be sure store in the dark without cotact between the resin and the daylight.
Paste resin characteristics
| Item | Value |
| Viscosity at 25ºC | 1000-20000 mPa.s |
| Special gravity at 25ºC(g/cm3) | 1.6-1.7 |
| Active ingredients | 25-35% |
| Flash | Above 70 |
We focus on composites resin business and have a tolling plant in Changzhou city. We can supply all kinds of modified resin to feed up your solutions for composites. The business covers the total composites industry.
Q1:Do you provide sample for the trial?
A1:We could supply small size package for free.but we have to charge the freight.
Q2.Could you supply customized products friendly?
A2: Yes,we do.We have a team to sever in Fortune 500 and be able to supply products to satisfied with the end-users' technical requirement.
Q3. What about your lead time?
A3: Generally 2-4weeks after the order confirmed.
Q4. What are your terms of payment?
A4:Usually we do EXW, FOB, CIF, and DDP.
- Similar Products