$200.00
100 Pieces (MOQ)
Light Waffle Slab Formwork for Concrete Waffle Formwork
Suzhou Topo New Material Co., Ltd.
Swipe or use the arrows to view product images.
Steel and Aluminum Green Formwork for Slab Concrete
| Price | $130.00 |
|---|---|
| Min Order | 500 Square Meters |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 507 people viewed |
Model NO.:
MB1812-MB606
After-sales Service:
Graphic Design, Total Solution for Projects
Warranty:
More That 5 Years
Certification:
Patent Certificate
Material:
Aluminum
Type:
Slab Formwork
Usage:
Concorete Panels Shuttering Formwork
Trademark:
GF
Transport Package:
Pallet
Specification:
1.8x1.2M-0.6X0.6M
Origin:
China
Product Description
Panel - Prop early stripping Green Formwork System - Aluminium Formwork / Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Propformwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high efficiency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Propformwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high efficiency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
We are committed to Excellent Services, Innovation & Quality Enhancement.
- Similar Products
$120.00
500 Square Meters (MOQ)
Panel Prop Shoring Formwork System for Concrete Construction
Qingdao Scaffolding Import and Export Co., Ltd.
$200.00
100 Pieces (MOQ)
Popular Ribbed (waffle) Slab Concrete Formwork for Construction
Suzhou Topo New Material Co., Ltd.
$200.00
100 Pieces (MOQ)
Customized Plastic Waffle Slab for Concrete Injection Moulding
Suzhou Topo New Material Co., Ltd.