Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Td21093 Hydroextractor Dry Centrifugal Machine Drying Machine for Electroplating Product

Price $10000.00
Min Order 1 Set
Availability In Stock
Shipping From Shandong, China
Popularity 287 people viewed
Model NO.:
TD 11
After-sales Service:
1
Voltage:
220V
Automatic Grade:
Semi-Automatic
Warranty:
1 Year
Certification:
CE
OEM Service:
Accept
Heating Model:
Electronic, Steam, Hot Water
Equipment Type:
Manual ,Semi-Automatic , Full-Automatic
Packaging Details:
Non-Standard / Wood CTN
Auxiliary Equipmen:
Rectifiers, Filters,Chiller, Pipe, Air Blower/etc,
Electroplating Plating:
Available: Zinc/Copper /Nickel/Tin/Chrome/Sliver
Application:
Drying
Condition:
New
Type:
PP and Ss
Trademark:
TONGDA
Transport Package:
Film Intertwine
Specification:
Customized
Origin:
China
HS Code:
8543300090
Product Description

 Td21093 Hydroextractor Dry Centrifugal Machine Drying Machine for Electroplating Product

Drying Machine   :

 



Principle

Adopts the principle of centrifugal drying and uses a motor to rotate through a belt, which drives the drum to rotate at a high speed of 800-1000 rpm to spin off most of the water and oil. When the parts are dried, the foot brake can still be used. The device quickly stops the rotation of the drum to improve production efficiency.

Installation

Choose a good place (as far as possible, place it in a ventilated and dry place), level the machine, fix the anchor bolts, and turn on the power for a no-load test machine for 30 minutes (turn the barrel clockwise) to check the rotation Direction and working condition of each component. The whole machine has a voltage of 380V, which is wired by an electrician, 3 live wires, and the two-color wires are ground wires.

Use

When using this dryer, your company must first install a leakage switch and check whether all parts and electrical components are damaged and leaked due to transportation, and whether the machine is running flexibly. , Dry place), level the machine, fix the foot bolts, and turn on the power for an unloaded test machine for 30 minutes to check the rotation direction of the drum and the working conditions of each component. When everything is normal, it can be delivered. The loading and unloading of the workpiece should be stopped, and care should be taken not to overload the drum and be subjected to violent impact. After the parts are installed, they must be covered before starting the motor to ensure safe production. The main power must be disconnected after work to avoid accidents.

Package & Delivery:

FAQ:

Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A:it is according to quantity.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

  • Similar Products
Full Page Contact Supplier