$390000.00
1 Piece (MOQ)
Automatic Transformer Radiator Fin Welding Machine
HANGZHOU LINAN XINRAN SOLAR EQUIPMENT CO., LTD.
Swipe or use the arrows to view product images.
Teu Container Making Machine Plant (Turnkey Project)
| Price | $20000000.00 |
|---|---|
| Min Order | 1 Set |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 254 people viewed |
Model NO.:
Whole machine line
Transmission Type:
Flexible
Rhythm:
Flow Production Line
Automatic Production Line:
Comprehensive
Production Scope:
Product Line
Flexible Production:
Intelligent Manufacturing
Condition:
New
Automation:
Automatic
After-sales Service:
Engineers Available to Service Machinery Overseas
Transmission Type:
Flexible
Automatic Production Line:
Comprehensive
Automation:
Automation
Flexible Production:
Intelligent Manufacturing
Rhythm:
Flow Production Line
Production Scope:
Product Line
Certification:
SGS
Product:
Teu Container
Number of Labors:
300 Worker One Shift (Customization)
Working Hours:
10 Hours Per Shift (Customization)
Container Material:
Steel, Wood Floor, Paint
Trademark:
CMT
Specification:
SGS
Origin:
Jiangsu Suzhou
Product Description
Brief introduction
3. Areas ( Customization & Design)
Raw materials area
Final product area
Production area
Management area
Labs and maintince area
Public uses area
Testing area
Container material: steel, wood floor, paint. A dry container is made according to the weight percentage: steel 70%, wood floor 12%, paint 3%: other 15%
Production process
1. Material processing
2. Part Machining
3. Welding
4. Painting
5. Assembly line for whole container (include: installing the floors and other accessories, sealing with glue, sticking the trademarks, making the beauty on the containers etc.)
6. Container testing
Machine lines pictures for your reference
1. Part machining & 2. Welding line
3. Finishing line & 4. Painting line
5. Container test station
More details, please feel free to contact with us.
1.Product: TEU Container
2.Production Capacity: 36,000pcs TEU/year
a)Number of labors: 300 worker one shift
b) Working hours: 10 hours per shift3. Areas ( Customization & Design)
Raw materials area
Final product area
Production area
Management area
Labs and maintince area
Public uses area
Testing area
Container material: steel, wood floor, paint. A dry container is made according to the weight percentage: steel 70%, wood floor 12%, paint 3%: other 15%
Production process
1. Material processing
2. Part Machining
3. Welding
4. Painting
5. Assembly line for whole container (include: installing the floors and other accessories, sealing with glue, sticking the trademarks, making the beauty on the containers etc.)
6. Container testing
Machine lines pictures for your reference
1. Part machining & 2. Welding line
3. Finishing line & 4. Painting line
5. Container test station
More details, please feel free to contact with us.
- Similar Products