Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Toothpaste Tube Heading Machine Toothpaste Tube Shoulder Equipment Toothpaste Tube Equipment Packing Production Line

Price $20000.00
Min Order 1 Piece
Availability In Stock
Shipping From Shanghai, China
Popularity 320 people viewed
Model NO.:
JX-HS120B
After-sales Service:
1 Year
Applicable Material:
Tube
Drive Mode:
Electric
Warranty:
1 Year
Speed:
85~120 Pieces Per Minute
Tube Diameter(mm):
19~60 mm
Tube Length:
45~220 mm
Power:
25kw
Weight:
4500kg
Extrusion Spraying Mode:
Servo Motor Control
Change Time of Head Tooling:
18~23 Minutes
Change Time for The Orifice Pin:
20~25 Minutes
Change Time of PE Color:
30~35 Minutes
Trademark:
Woolley
Transport Package:
Wood
Specification:
3470*2900*2490mm
Origin:
Shanghai
Product Description
Extruded Tube Line
(project solution)
line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100)
 line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100)
Laminated Tube Line
 (project solution)
line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100)
 line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50)
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.

Q2:Are you manufacturer?
Yes, We are the manufacturer.

Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc


Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc

Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.

Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.

Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.

Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.
  • Similar Products
Full Page Contact Supplier