Swipe or use the arrows to view product images.
Vertical Energy-Efficient Hrsg Egb for Gas Turbine System Supplier with 25years Experiences
| Price | $85000.00 |
|---|---|
| Min Order | 1 Set |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 398 people viewed |
Model NO.:
KNGT-L-001
Function:
Steam Boilers, Waste Heat Boiler
Fuel:
Waste Heat
Installation:
Assembled Boiler
Structure:
Water Tube
Media:
Steam and Water
Water Circulation:
Natural Circulation
Drum Placement:
Vertical Boiler
Pressure:
Low Pressure
Manufacturing Level:
A
Burning Style:
Chamber Combustion Boiler
Usage:
Industrial, Power Station
Trademark:
Kaineng
Transport Package:
Standard Export Package
Specification:
As per order
Origin:
China
HS Code:
8402120090
Product Description
Vertical Energy-efficient HRSG EGB for Gas Turbine System Supplier with 25years experiences
Kaineng Gas turbine waste heat recovery boiler system offers a full range of custom designed HRSG boiler systems to meet customer's most demanding requirements.
1. Exhaust gas boiler HRSG for gas turbines from 1MW to 40 MW
2. Design structure: factory assembled natural circulation water tube designs
3. Single or multiple boiler pressure designs
4. Boiler design features to accommodate high cycling operation
5. Feed-water and condensate heaters for maximum heat recovery
Advantages of waste heat recovery boiler system for gas turbine:
1) The heat exchange efficiency is up to 98%;
2) Small size, light weight and low investment;
3) Service life is more than 20 years;
4) The structure is designed to resist vibration and noise;
5) The minimum investment payback period is 4 months;
6) Complete shop assembly to minimize installation cost
7) Easy operation and maintenance;
Kaineng Service:
Pre-sale service:
Kaineng helps customer to choose the proper exhaust gas boiler model according to different requirements of various industry. Before delivery we will provide boiler drawings, auxiliary equipment drawings, foundation drawing, layout drawing, etc.
In-sale service:
Kaineng keeps 24 hours online and keeps close contacts during the production process to ensure on time delivery with perfect finished product.
After-sale service:
1. provide full range of original quality spare parts.
2. Kaineng offer project guidance service, we will dispatch engineers to your local project site to guide the installation and commissioning.
3. Our engineers will held a training for boiler workers to ensure the safe operation.
4. Free maintenance and repair for one year and lifelong service.
Kaineng Boiler Transportation:
Kaineng Boiler Factory Area
Kaineng Gas turbine waste heat recovery boiler system offers a full range of custom designed HRSG boiler systems to meet customer's most demanding requirements.
1. Exhaust gas boiler HRSG for gas turbines from 1MW to 40 MW
2. Design structure: factory assembled natural circulation water tube designs
3. Single or multiple boiler pressure designs
4. Boiler design features to accommodate high cycling operation
5. Feed-water and condensate heaters for maximum heat recovery
Advantages of waste heat recovery boiler system for gas turbine:
1) The heat exchange efficiency is up to 98%;
2) Small size, light weight and low investment;
3) Service life is more than 20 years;
4) The structure is designed to resist vibration and noise;
5) The minimum investment payback period is 4 months;
6) Complete shop assembly to minimize installation cost
7) Easy operation and maintenance;
Kaineng Service:
Pre-sale service:
Kaineng helps customer to choose the proper exhaust gas boiler model according to different requirements of various industry. Before delivery we will provide boiler drawings, auxiliary equipment drawings, foundation drawing, layout drawing, etc.
In-sale service:
Kaineng keeps 24 hours online and keeps close contacts during the production process to ensure on time delivery with perfect finished product.
After-sale service:
1. provide full range of original quality spare parts.
2. Kaineng offer project guidance service, we will dispatch engineers to your local project site to guide the installation and commissioning.
3. Our engineers will held a training for boiler workers to ensure the safe operation.
4. Free maintenance and repair for one year and lifelong service.
Kaineng Boiler Transportation:
Kaineng Boiler Factory Area
- Similar Products
$100.00
100 Pieces (MOQ)
9 Us Gallon Full Acceptance Multi-Purpose Bladder Expansion Tank
Taizhou Tianyang Electrical Co., Ltd.