$200.00
100 Pieces (MOQ)
Light Waffle Slab Formwork for Concrete Waffle Formwork
Suzhou Topo New Material Co., Ltd.
Swipe or use the arrows to view product images.
Viaduct Structural Column Steel Formwork System
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 389 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Info.
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is renowned for its strength and durability, offering unparalleled reusability in various construction projects. Its easy assembly and erection make it ideal for projects requiring consistent structures, such as high-rise buildings, roads, and bridges.Packaging:
1. The total net weight for a loaded container is generally between 22 to 25 tons. Final confirmation is required before loading.2. We use specialized packaging for different products to ensure safety and integrity:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are bagged and then placed on pallets for secure transport.
---Wooden cases: Available upon customer's request for additional protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: Typically, we require 20-30 days to complete production after receiving the customer's down payment for a full container.
2. Transportation: Delivery times depend on the destination port's charges.
3. Special requirements can be negotiated to meet specific needs.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products used inbridges, tunnels, and other structural applications.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our products directly to contractors, building companies, material suppliers, and trading companies.
C: Our exceptional formwork products are also available to support our peers worldwide.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, manufacturing takes 30~60 days based on the type and quantity of products required.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance payable before shipment.
- Similar Products
$120.00
500 Square Meters (MOQ)
Panel Prop Shoring Formwork System for Concrete Construction
Qingdao Scaffolding Import and Export Co., Ltd.
$200.00
100 Pieces (MOQ)
Popular Ribbed (waffle) Slab Concrete Formwork for Construction
Suzhou Topo New Material Co., Ltd.
$200.00
100 Pieces (MOQ)
Customized Plastic Waffle Slab for Concrete Injection Moulding
Suzhou Topo New Material Co., Ltd.