Automated Milling Machine for Elevator Guide Rail Metal Processing Video, Demo, How It Works & Features
This video cannot be played in your browser.
Need price or Contact this supplier?
Get a Quote
Product Specifications
Production Scope:
Product Line
Automation:
Automation
Applicable Scope:
T75-3/B - T127-2/B Specifications Guide
Processing Time:
65s/Per
Production Program:
240000 Per Year(Lwo Shifts)
Power for The Whole Line:
200kw
The Pressure Required:
0.6-0.9MPa
He Area Required:
12000X14000(mm)
Warranty:
1 Year
Transmission Type:
Flexible
Automatic Production Line:
Elevator Guide Rail Metal Processing
Flexible Production:
Intelligent Manufacturing
Rhythm:
Flow Production Line
Trademark:
Faer Lin precision Machinery
Origin:
Changzhou, China