1.1 Basic Design Conditions
1.1.1 Atmosphere Conditions:
Atmospheric pressure 760mmHg
Atmospheric temperature 32ºC
Relative humidity 75%
- Air conditions:
CO2 of Atmospheric: ≤350 ppm
CnHm of Atmospheric: ≤3 ppm
SO2 and H2S: ≤5 ppm
1.1.3 Power supply:
Voltage: 380V//220V
Frequency: 60HZ
Total Power: 98KW
- Main Performance Data
Oxygen Purity: ≥99.6%
Working pressure: ≤1.2Mpa
Starting time: 6~8h
Total power: 98KW
Power supply: 380V//220V/60Hz
- Main Equipments
- Screw Air compressor 1 set
- Main Equipments
- Purifier 1 set
- Turbine expander 1 set
- Rectification Column 1 set
- Refrigerator 1 set
- Liquid Oxygen Pump 1 set
- Oxygen Filling Unit 1 set
1.3.8 Automatic oxygen purity analyzer 1 set
1.3.9 Connecting pipe 1 set
1.3.10 Low-voltage Distributor 1 set
1.3.11 Molecular sieve 1 set
1.3.12 Two years Spare parts 1 set


Main parts of oxygen generator (Including, but not limited) | ||||
Description | Model | Material | Manufacture | Quantity |
Adsorption Vessels | Q235B | Cape-Golden | 2pcs | |
Air receiver tank | 600L/8bar | Q235B | Cape-Golden | 1pcs |
Oxygen receiver tank | 600L/8bar | Q235B | Cape-Golden | 1pcs |
Zeolite Molecular Sieve | XO8 | CECA,France | enough | |
Pneumatic-Controlled Valves | VNB series | SMC Japan | 8pcs | |
Solenoid Valves | SY-5120-4DD | SMC Japan | 7pcs | |
Air distribution system | ZYFB | steel | BF Germany | 2set |
ZMS Filling System | ZYYJ | steel | Cape-Golden | 2set |
High-efficiency Residual Gas Silencer | SL-2 | Carbon steel | Cape-Golden | 1set |
PLC | Smart 7-200 | Siemens Germany | 1pcs | |
Oxygen Analyzer | P950 | Chang'ai | 1set | |
Touch screen controlling system | Smart7-200 | Siemens Germany | 1set | |
Digital flow meter | PF series | SMC Japan | 1set | |
Pressure Transmitter | IS series | SMC Japan | 1set | |
Online Pressure Gauge | China(High qualiy) | 6pcs | ||
Other valves ( pressure regulator , ball valves and so on) | China(High qualiy) | enough | ||
pipelines | Carbon steel | Cape-Golden | enough | |
*The main oxygen generator is skid mounted and needs no foundation as well as other related equipment. Drains for water should be prepared. | ||||