
Core veneer is the basic material for many wood-based panel products, including plywood,LVL, etc.
4'Feet spindle less rotary peeling line is the most widely used technology for manufacturing the core veneer.
The working line main process includes: Raw logs conveyor -> Hydraulic wood rounding debarker -> Round log conveyor -> NC spindle less rotary peeling machine -> Veneer conveyor line -> Veneer automatic stacker.
The working line has three working ways according to customer's investment budget and production capacity requirements:
A: Fully automatic working line, none-person operation, save labors cost, 24 hours continuous working, high production capacity.
B: Semi-automatic working line, only need two workers operation, suitable for medium scale factories.
C: Manual working line, only need invest on two main machines: wood rounding debarker & veneer peeling lathe, suitable for the small scale factories or new veneer business trial running.
We supply the customized machines solutions for all customer's requirements.
Technical specifications:
Machine name | 4'Feet spindle less rotary peeling machine |
Machine model | FM-BXQ1815/500B |
Max. Working diameter | Ø500mm |
Min. working diameter | Ø22mm |
Max. Working length | 1400mm |
Veneer thickness range | 0.8 - 4.0mm |
Rollers diameter | Ø125mm |
Single roller motor power | 5.5 Kw x 2 |
Double roller motor power | 11Kw x 1 |
Feed motor power | 7.5Kw |
Rotary guillotine motor | 1.5Kw |
Veneer conveyor motor | 1.5 Kw x 2 |
Total motor power | 34Kw |
Gearbox type | Helical harden surface R87 |
Working speed | 80m/min |
Machine overall dimension | 3500 x 1800 x 1500mm |
Machine net weight | 6500Kgs |
Remark | 1.With automatic left-core pneumatic dropper 2.With automatic lubrication pump system 3.Automatic emergency stop protective device |







Why Choose Us:
--------------------------


01 Products are to be packed in wooden cases or cartons or...?
Wooden package
02 Production cycle of the product?
20-30 days
03 Different products should be different, can you give a general range?
3-14 days or 7-30 days
04 Production cycle of customized products?
30-40days
05 Product lead time is 3-7 days, 7-15 days for large quantities, or?? 20- 30days