Antiskid Chain for Wheel Loader Hot Sale

Price $2000.00 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Shandong, China
Popularity 254 people viewed
Quantity
+-
 

Shandong UT Trailer Parts Co., Ltd.

VIP   Audited Supplier 19 years
Profile Certified by SGS/BV
  • Shandong, China
  • Steven Liu (Mr.)  
    Manager
Excavator Attachment
Excavator
ISO9001:2008
New
1 PC
UT
Standard Exported Woodenwith Strong Pallet Package
Shandong China
Product Description




Product introduction
Anti-skid protection crawler is a tool mounted on wheel loader, scraper and other wheel type engineering machinery. It can help tyres to prolong service life, enhance tyre anti slip and anti stap, fill the blank of engineering machinery accessories, widely used in stone field, mine and other environment, it have been improved the work efficiency and save the cost.
Advantages
1. Long service life and good antiskid effect
The service life is usually 3 years (8 hours per day) , the crawler can be repaired and replaced separately. With the design of crawler, it has the advantages of large contact area with the ground and tight fitting with the tire after installation. The equipment can better grasp the ground and the anti slip effect is far better than the traditional skid chain.
2.To protect and improve the efficiency of the tire
The installation of the skid protection crawler can reduce the loss of tires under harsh working conditions and the service life of tires can be prolonged under the same working conditions. The value of every 50 loader tires is about $1,000 and the cost of tire depreciation, repair and replacement is about 5,000 dollars per year. After three years of service life, the cost of maintaining tires can save nearly $17,000 after installing a skid protection crawler, and it can also prevent the skidding of the vehicle, reduce the repetition of the movement, speed up the work speed and improve the efficiency of the comprehensive work by nearly 30%. The work that can be completed in 10 days, now you be done for 7-8 days.
3. High strength operation can save fuel consumption and economic value
The strength and efficiency is obviously improved after installation of the skid protection crawler, loading/unloading the same quantity of residue and ore becomes easier. Usually,the worker needs to step twice throttle to complete a work, now step on throttle once is enough, greatly reducing the fuel consumption and reducing the life and production cost. After installing the skid protection crawler,  it reduces the daily wear and tear of the equipment, reduces the working time by almost 30% under the same workload and working conditions. It also brings high value protection to the equipment, making the loader look like new. When the old loader is sold, the sales price can also be improved.
4. Easy to load and unload, greatly lighten the burden of the driver's work
It only takes two people to install the skid protection crawler. It will only takes about 20 minutes to complete the installation work. There is no no loose phenomenon unit there's a special case. The noise is small, the accessories are small, the maintenance rate is low and the workload of the driver is reduced.
5. Adaptable to the worn tires
When installing the skid protection crawler, the gas in the tire should be released first. After installation, the tyre is tightened and the skid flank is designed. The worn tires can also be installed with skid protection crawler.
6. The operation and passing ability of the enhanced equipment
The track increases the contact area of the tire to the road surface, and enhances the passing capacity of the equipment under complex terrain conditions.

 
Tyre sidePly RatingRimInflated DimensionsMax loadInflation PressureService Lifeweight       (Kg/pc)
Standard rimPermitted rimSection Width (mm) Overall Diameter(mm)655015
Km/hKm/hKm/h
23.5-251619.5/2.5/59516155170625069703506 months570
23.5-25201673553066807460280570
 


  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$26.00 10 Pieces(MOQ)

Air Tank Truck Parts Air Tanker Aluminum Steel Air Tank

Shandong UT Trailer Parts Co., Ltd.
$1666.00 1 Piece(MOQ)

Jcb Excavator Attachments Rotary Earth Auger Drill Bit

Shandong UT Trailer Parts Co., Ltd.
$125.00 50 Pieces(MOQ)

Agricultural Trailer Parts 1100mm Jost Type Trailer Turntable

Shandong UT Trailer Parts Co., Ltd.
$30.00 100 Pieces(MOQ)

6 Studs Farm Trailer Stub Axle

Shandong UT Trailer Parts Co., Ltd.
$18.00 200 Pieces(MOQ)

205-70-19570RC Series Rock Chisel Bucket Tooth Suit for PC200RC Construction Machine Spare Parts, Excavator Bucket Teeth

Jincheng City Ruixi Casting Co., Ltd.
$1300.00 1 Piece(MOQ)

Efficient Auger Blade Bending Machine for Large Scale Screw Conveyor Manufacturing Processes

Shandong Cad Industry Machinery Equipment Co., Ltd.
$10.00 100 Pieces(MOQ)

Round Shank Conical Chisel Drilling Teeth Bks186 Drilling Bit

Yanggu Jixing Drilling Tools Co., Ltd.
Negotiable 1000 Pieces(MOQ)

CNC Machining Parts Made in China

Qingdao Top Xin Machinery Co., Ltd.
$800.00 2 Pieces(MOQ)

708-1W-43110 708-1s-13490 708-1s-13450 708-1s-13130 708-1s-13370 708-1s-13360 708-1s-13320 708-3s-14290 Piston Sub Assy for PC55mr-3 Excavator Hydraulic Pump

Guangzhou Haotai Machinery Parts Co., Ltd.
$4.00 1 Piece(MOQ)

Foundation Drilling Tools Auger Teeth Pengo Dirt Teeth (16R55) for Hole Digger

Changzhou Prance International Trade Co., Ltd.