Aoneng Level 3 120kw Home Mobile Rapid Fast Solar DC Electric Vehicle Car Battery EV Charger Charging Station with GB/T CCS2 Dual Connector Ocpp1.6 Commercial

Price $23000.00 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Zhejiang, China
Popularity 344 people viewed
Quantity
+-
 

Hangzhou Aoneng Power Supply Equipment Co., Ltd.

VIP   Audited Supplier 3 years
Profile Certified by SGS/BV
  • Zhejiang, China
  • Barry Jiang (Mr.)  
    Senior Sales Manager
ANDCE1-360HP
CCS1, CCS2, CHAdeMO, GB/T
Floor Type
Public Use
One Pile with Multiple Charges
Credit Card Payment, Mobile Remote Operation, RFID Authentic
3pH+N+PE(L1, L2, L3, N, PE)
CCS2*2
120kw--360kw
CE+CB
Aoneng
Wooden Case Packing
750 (W)*750 (D) *1800 (H) mm
China
850440
Product Description
Product Description

Product Parameters
Input connection
3P+N+PE(L1,L2,L3,N,PE),50/60 Hz
Input voltage
400±10% Vac
Rate power
120kW
180 kW
240 kW
300 kW
360 kW
Output voltage
200~1000 Vdc
Output current (Max)
Single connector:
250 A@below 480 V
Dual connector:
2x200 A@below 300 V
Single connector:
250 A@below 720 V
Dual connector:
2x250 A@below 360 V
Single connector:
250 A@below 960 V
Dual connector:
2x250 A@below 480 V
(Optional 375 A)
Single connector:
375 A@below 800 V
Dual connector:
2x375 A@below 400 V
Single connector:
375 A@below 960 V
Dual connector:
2x375 A@below 480 V
Rate input current
187 A
280 A
373 A
466 A
559 A
Input cable size (mm²)
3x95+2x50
3x150+2x70
3x185+2x95
3x240+2x150
3x300+2x150
Power factor
≥0.99
Peak efficiency
≥96%
HMI
10.1 Inch Touch-Screen
Charging authentication
RFID, QR Code, Plug and charge (Via EVCCID), NFC, Credit card (via optional VPOS)
Network connection
4G,RJ45
LED status indicator
Green-Standby; Red - Charging in progress; Orange- error
Communication protocol
OCPP 1.6
Protection
Over voltage;Under voltage;Leakage current;Over current;Over Temperature;Short circuit;Reverse polarity;Surge protection, etc;
Charging port
CCS COMBO 2
Charging cable length
4.5 meters, others as required
Dimensions
800(W)×800(D)×1900(H)mm / Optional cable management: 1000(W)×280(D)×250(H)mm
Ip XX
IP55
Operation temperature
-30ºC~+60ºC,derating above 50ºC
Mounting
Floor standing
Optional
1, VPOS
2, PTB meter;
3, Cable management
 
Certifications

Case Show

FAQ

Q:   Are you the factory or trading company?
A:      We are factory with more than 20 years in the field of DC power supply solution,  traction power supply and new energies. We warmly welcome you for the visit.

Q:   How is the delivery time?
A:      Generally, the delivery time between 7-30 days after getting client's payment. For accurate info depends on the products and the quantity, we can make further communication on this.

Q:  Do you have MOQ requirements?
A:     MOQ 1 PC,besides,we have more than 100 technicans to fully meet with customized requirements.

Q:  How long to fully charge a car?
A:      To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.

Q:   Can you provide customized service?
A:      Yes. we have been getting involved with the OEM and ODM projects since 2004. So that we can provide professional customized service for our clients.

Q:   Do you have after sales service?
A:      Yes, we have the after-sales service team. Our after-sales engineer Can give the support and instruction by video or phone call while needed.

Q:   Do you make the test after finishing production?
A:      Yes, our production engineer team will do the test while goods finished, and we will prvoide the test info to clients for reference before delivery.

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$6666.00 1 Piece(MOQ)

Portable 30kw DC Fast Charging Station GB/T CCS2 DC EV Charger Mobile Electric Vehicle Charging Pile Portable EV Charger

Hangzhou Aoneng Power Supply Equipment Co., Ltd.
$23000.00 1 Piece(MOQ)

Aoneng Level 3 120kw Home Mobile Rapid Fast Solar DC Electric Vehicle Car Battery EV Charger Charging Station with GB/T CCS2 Dual Connector Ocpp1.6 Commercial

Hangzhou Aoneng Power Supply Equipment Co., Ltd.
$730.00 1 Piece(MOQ)

IP65 EV Charger AC Wallbox 7kw Electric Vehicle Charging Station Type 2

Hangzhou Aoneng Power Supply Equipment Co., Ltd.
$6000.00 1 Piece(MOQ)

Factory New Energy 60kw Mobile Rapid Fast Solar Powered DC Electric Vehicle Car Battery EV Charger Charging Station Single Gun CCS2 GB/T Level 3 Ocpp1.6 APP

Hangzhou Aoneng Power Supply Equipment Co., Ltd.
$9706.00 2 Pieces(MOQ)

Wholesale 60kw 120kw DC Fast EV Charging Station Commercial Electric Car EV Charger with Ocpp

Nanjing Jiutai Information Technology Co., Ltd
$6571.40 100 Pieces(MOQ)

GAC Energy GB/T High-Speed 120kw DC EV Charger Station

GAC Energy Technology Co., Ltd.
$1640.00 1 Piece(MOQ)

Samrt Wall-Mounted EV DC Fast Charger Station with Ocpp2.0

Nancome Electric Technology Co., Ltd.
$11143.00 1 Set(MOQ)

Tedawn CE Oca Certified IP54 80kw/120kw/160kw/200kw/240kw DC EV Charger Electric Vehicle Charging Station

Zhuhai Dawn Science&Technology Co., Ltd.
$8794.00 1 Piece(MOQ)

80kw 120kw 180kw 240kw Dual Gun DC Fast Charging Station for Electric Car EV Charger Liquid Cooling 360A 600A

Guangzhou Max Power New Energy Technology Co., Ltd.
$15000.00 1 Piece(MOQ)

Floor Stand CCS2 Ocpp Dual DC EV Charger Solution 300kw for Evse Electric Car Commercial Fast Charging Station Pile 2 Gun

Shijiazhuang Tonhe Electronics Technologies Co., Ltd.