
Pneumatic hammer is a type of automatic knocking device which can effectively prevent the adhesion and blockage of the powder in the pipeline, the silo and the hopper conveying system. And it will not damage or deform to the device wall of the equipment.
Pads for liquidity can effectively solve the various bad state in the diagram.
The vibrating bin aerator develops combined aeration-vibration which favours in a particularly efficient way.
FEATURES AT A GLANCE
Air Consumption:0.12 m3/h.
Weight: 250G



Product Type:

PRODUCT SPECIFICATIONS


To choose the suitable model, please tell us | Build Solutions for you |
*Name and feature of the raw material? *Rated Pressure: bar? *Air Consumption: m3/h? *Weight: kg/g? | *Design the equipment according to your request. *Providing solutions according to the real situation. *Relevant technical documents would be available. *Delivery on time.Warranty: 12 months |


* Highly abrasion-resistant
* Food-grade (FDA-approved)
* Can be installed in all types of silos or hoppers
* Can operate from 2 to 6 bar (29 or 87 psi)
* Easy to install
* Maintenance-free
* Self-cleaning
* Silent
* Operating temperature: -40°C =>170°C -40F=> 338F



Pre-Sales Service | After-Sales Service |
Customer consultant 24 hour online; Engineer team provide design drawing; Skilled staff responsible for production; Take pictures for all production process. | Provide installation instruction; Solve any problems involved; Tell the machinery maintain guidance; Regular monthly sales tracking. |



Bolted Silo Container Horizontal Silo Big Bag Hopper






Concrete Batching Plant Mobile / Dry Concrete Batching Plant Planetary Mixer / Twin Shafts Mixer

May you introduce your Factory?
Our factory is with 10,000m2 factory floor area. More than 100 workers will service for you. Our factory is located in Shandong -the only province which cover all industrial sectors in China.
Full Process Solution Provider of Mixing, Storage, Conveying.
What is your Delivery time?
3-7 days for spare parts; 10-20 days for simple machine. 30-50 days for production line.
CE certification is provided.
QC checking work is including from material, steel processing, welding, painting, electric system, test, delivery, installation. Quality check for full process
How can I Get Solution to my inquiry?
More project and contact information more better. Engineers will make plan for you. Our Sales manager will Quote to you in the first time.