Automatic Transformer Corrugated Fin Radiator Fin Welding Robot Transformer Tank Welding Robot Machine

Price $3000.00 Compare
Min Order 9 Pieces
Availability In Stock
Shipping From Zhejiang, China
Popularity 446 people viewed
Quantity
+-
 

Hangzhou Giantway Import & Export Co., Ltd.

VIP   Audited Supplier 5 years
Profile Certified by SGS/BV
  • Zhejiang, China
  • Wan Ping (Ms.)  
Transformer Tank Welding Robot Machine
Power
Three
Amorphous Alloy Transformer
Oil-immersed Type Transformer
Auto-transformer
ISO9001-2000, ISO9001, CCC
Single-phase Transformer, Power Transformer, Distribution Transformer
Power Frequency
EC
/
/
/
customization
China
8515809090
Product Description




Corrugated fuel tank process:

1. After the box cover is cut, the magnetic isolation plate is welded first, and then bent to correct the deformation. Then robot weld all the accessories.
2. The box along the angle iron is cut by the profile laser cutting machine, and then manually assembled and spot welded, and the robot is fully welded. 3. The bottom of the four-sided box and the triangular frame, after bending, are manually assembled and spot-welded, and the robot is fully welded. 4. After the corrugated sheet is spot welded on the frame, the robot can be used to realize full welding. 5. After full welding, go to the assembly line, robot welds the channel steel of the foot, manually repairs the welding, and starts leak testing.

Wind change oil tank process:

channel steel of the foot, manually repairs the welding, and starts leak testing.

process flow:

tank edge robot automatic welding workstation
Welding tank along the range: 1400*1000, two positioners.
work process: 1 Cutting, put the 6-meter angle iron into the profile laser blanking equipment to automatically complete the hole cutting. 2 Manually place the lowered angle iron on the laser-cut box cover tooling for assembly and spot welding, and then place it on the positioning fixture of the positioner, and the robot completes the welding. 3 After welding, finish grinding in the grinding room.
tank along the technological process: blanking→assembly spot welding→pressing→welding→manual grinding
Welding takt time: 7 minutes Focus on: Most of the profiles are rebuilt from miscellaneous steel, and the welding requirements are very high. We have equipped with a 500P pulse welding machine, which can effectively avoid welding defects such as splashes, pores, and incomplete penetration.

Cover welding workstation

Semi-Automatic PET Bottle Blowing Machine Bottle Making Machine Bottle Moulding Machine PET Bottle Making Machine is suitable for producing PET plastic containers and bottles in all shapes.
Process flow of box cover:laser blanking → edge folding → manual spot welding → KBK loading → robot full welding → inspection handover
1.The magnetic isolation plate is welded with stainless steel, and the deformation is very large, so it is not suitable for welding on the positioner. 2.It needs to be welded on a separate platform or manually welded.
Welding time beat: 10 minutes one
 
tank bottom process:Laser blanking → bending → assembly spot welding → robot vision positioning full welding
Welding time beat: every 5 minutes at the bottom of the box

tank corrugated sheet welding workstation below 630KVa (ground assembled corrugated sheet, upper positioner robot welding)

 
1. Manually assemble the corrugated sheets on the ground, and then put the assembled fuel tank on the positioner, and the robot starts to search for full welding. 2. Core technology: The robot tracks the weld seam in real time, identifies the location of the corrugated sheet, and the robot wraps it to ensure 100% leak-free. However, there may be leaks at the intersection of the welds and the 8 corners, which need to be covered manually.
Box process flow: Corrugated sheet assembly spot welding → robot vision positioning full welding Welding time beat: 20 minutes for a fuel tank with corrugated sheets on two sides, 40 minutes for a tank with corrugated sheets on four sides

Box bottom process:

Laser blanking → bending → assembly spot welding → robot vision positioning full welding Welding time beat: every 5 minutes at the bottom of the tankk
Core technology: The robot tracks the weld seam in real time, recognizes the location of the corrugated sheet, and the robot wraps it. Make sure it is 100% leak-free. However, there may be leaks at the intersection of the welds and the 8 corners, which need to be covered manually.


FAQ

1.Q:What's your main products?
A: We provide professional Transformer Accessories and Insulation Materials with 15 years experience.
 
2.Q Why chooses us?
A: Well experienced in our field. Our staff of engineers offers high-valued design guidance to
assure product performance and efficiency. And our strict adherence to rigorous quality control and tolerance standards lead to easier assembly of finished components at your facility. We always focus on Quality.
 
3. Q:How can you control your quality?
A:For each production processing, we have complete QC system for the chemical composition, physical and electrical properties.After production, all the goods will be tested according to related standards, and the ex-factory test reports will be sent along with shipment documents.
 
4. Q: Does your company accept customization?
A. Yes, we can accept OEM/ODM.
 
5.Q: Do you have the products instock?
A: Depends on your request,we have standard models in stock.Some special product and big order will be newly produced according to your order.
 
6. Q: What's your payment terms?
A: We usually accept all kinds of payment terms, T/T, L/C, Western union, Cash.
 
7. Q: What do you have for certificate?
A: :Quality Service Credit Certificate, Enterprise Credit Grade Certificate,Credit Operation Demonstration Unit Certificate, Quality Management System Certificate, etc.
 
8.Q:Can we visit your company?
A:Yes,for sure, you are welcome to visit our company.
Thank you for reading,  click here to consult more product information.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$10.00 100 Pieces(MOQ)

ANSI En DIN Standard High Voltage Porcelain Bushing Transformer Bushing

Hangzhou Giantway Import & Export Co., Ltd.
$18.00 5 Pieces(MOQ)

On Load Tap Changer Off Load Tap Changer Transformer

Hangzhou Giantway Import & Export Co., Ltd.
$1000.00 20 Sets(MOQ)

Electric Transformer PC Pg Radiator Corrugated for Oil-Immersed Power Transformer Radiators

Hangzhou Giantway Import & Export Co., Ltd.
$200000.00 1 Piece(MOQ)

Three-Phase Power Transformer Epoxy Resin Dry-Type Transformer Active Part

Hangzhou Giantway Import & Export Co., Ltd.
$19999.00 1 Piece(MOQ)

Low Loss S13 S11 33kv/35kv 50kVA-2500kVA Outdoor Three Phase Oil Immersed Distribution Transformer

Yi'antong Electric Power Engineering (Shandong) Co., Ltd.
$19999.00 1 Piece(MOQ)

Full Sealed High Voltage S11-M 35kv 50kVA 200kVA 1250kVA 1000kVA Oil Immersed Three-Phase Distribution Transformer

Yi'antong Electric Power Engineering (Shandong) Co., Ltd.
$19999.00 1 Piece(MOQ)

S11 Sealed Power Transformer 6-10kv Oil Immersed Power Transformer 10kv/35kv High Voltage Transformer

Yi'antong Electric Power Engineering (Shandong) Co., Ltd.
$59999.00 1 Piece(MOQ)

S11-500 500kVA 10kv Eco-Conscious Design 3 Phase High Voltage Electric Power Distribution Oil Transformer Price

Yi'antong Electric Power Engineering (Shandong) Co., Ltd.
$59999.00 1 Piece(MOQ)

S13-M S11-M Electronic 10-35kv 30-25000kVA Power 10kv Three Phase Oil Immersed Transformer with ISO9001

Yi'antong Electric Power Engineering (Shandong) Co., Ltd.
$39999.00 1 Piece(MOQ)

Sbh15 315/400/500/630/800kVA Oil-Immersed Amorphous Alloy Core Three Phase Power Distribution Transformer

Yi'antong Electric Power Engineering (Shandong) Co., Ltd.