China Factory Supply Mgps Control Panel

Price $1000.00 Compare
Min Order 1 Set
Availability In Stock
Shipping From Jiangsu, China
Popularity 314 people viewed
Quantity
+-
 

Zhenjiang Longyear Marine Equipment Co., Ltd.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
LY-C
video Service
Physical Treatment
Mgps
Ship
Longyear Marine
Wooden Case
depends on
China
Product Description
Working princible:
MGPS Anti-Fouling System is a system that can effectively kill the sea creatures, protect the sea chest and seawater pipe, and make it not easy to be excessively absorbed by the sea creatures. The system is generally installed on a submarine gate and consists of electrodes made of copper and aluminum. Its working principle is to use the toxic substance Cu2O produced by electrolysis and the flocculent carrier Al(OH)3 to attach to the inner wall of the seabed door and seawater pipeline, effectively inhibiting the habitat and growth of marine organisms.




1) at the anode free chlorine is formed 2 Cl ⇔ Cl2 + 2e
2) at the cathode OH-ions are formed 2 H2O + 2e- ⇔ 2 OH-+ H3
3) around the anode the OH- ions react with the Na+ ions and Cl2 to produce sodium hypochlorite
    2 NaOH + Cl2 ⇔ NaOCl + NaCl + H2O

Marine Growth Preventing System (MGPS)control box with multiple sets of multiple independent constant-current control module within the seawater bin anode (anti-fouling electrode of coppe, anti-corrosion electrode of aluminum oiron electrodes)were poweed electolysis to produce anti-fouling,anti- corrosion ions in seawater and then distributed throughout the sea watecooling piping system to effectively reduce and prevent marine biofouling seawater pipeline caused by biological corrosion and electrochemical corrosion, thus ensuring the nomal operation of seawater piping systems
T he device is divided into diect installation and increase the electrobath to indirect installation.

What are the available shipping methods?

Port location: Ningbo or Shanghai, China Shipping to: Worldwide Shipping method: by sea, by air, by express Estimated delivery dates depend on specific order list, shipping service selected and receipt of cleared payment. Delivery time may vary.


02

What payment methods are supported?

Payment: By T/T, Western Union, Money Gram for samples 100% with the order, for production,30% paid for deposit by before production arrangement, the balance to be paid before shipment. Negotiation is accepted.


03

How to control the quality of Ruihua Products?

Products Material: Strictly control the material used, make sure they can meet international requested standards, and maintain long working life.
Semi-finished products inspection: We examine the proudcts100% before finished. Such as Visual Inspection, Thread testing, Leak Testing, and so on.
Production line test: Our engineers will inspect machines and lines at fixed period.
Finished Product Inspection: We do the test according to ISO19879-2005, leakage test, proof test, re-use of components, burst test, cyclic endurance test, vibration test, etc.
QCTeam:A QC team with more than 10 professional and technical personnel. To ensure 100% products checking.


04

How long is the product date of delivery probably?

The different product, as well as the diferent run quantity can affect the date of delivery, but in ordinary circumstances product date of delivery about 30 days. Most of products have stock, contact us anytime to get more information.


05

How to Custom-made(OEM/ODM)?

 If you have a new product drawing or a sample, please send to us, and we can custom-made the product as your required. We wllalso provide our professional advices of the products to make the design to be more realized & maximize the performance.


06

How about the mini order quantity?

We don't have strict requirments on most items, due to we have stock. More information can send us the enquiry list, we check and reply you. For custom-made, MoQ will be adviced due to the specific product.

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$700.00 1 Piece(MOQ)

Cr350mm Clear View Screen Window for Ship Wheelhouse

Zhenjiang Longyear Marine Equipment Co., Ltd.
Negotiable 2 Sets(MOQ)

Anti-Fouling System Mgps Anodes for Ship Protection

Zhenjiang Longyear Marine Equipment Co., Ltd.
$300.00 1 Piece(MOQ)

Updated CD4212-2 Life Boat Charger

Zhenjiang Longyear Marine Equipment Co., Ltd.
$9000.00 1 Piece(MOQ)

Loading Test Water Weight Bag for Derrick

Zhenjiang Longyear Marine Equipment Co., Ltd.
$15000.00 1 Set(MOQ)

Marine Windlass for All Kinds of Vessels and Boats

Anhui Jantle Marine Engineering Co., Ltd.
$1.00 1000 Pieces(MOQ)

Outboard Part Water Pump Impeller 3c8-65021-2

Taizhou Hjumbo Machinery Co. Ltd.
$1000.00 1 Ton(MOQ)

Offshore Mooring Anchor with Certificate

China Shipping Anchor Chain (Jiangsu) Co., Ltd.
$1.08 10 Pieces(MOQ)

Turning Box Gear Bushing Spare Parts for Haibo P65 Electric Trolling Motor

Sunmax Industry Co., Ltd.
$31.00 1 pieces(MOQ)

37110-93j00 4 Stroke Boat Marine Main Ignition Switch Assy for Suzuki Outboard Motor Remote Control Box

Yongkang Xinhangji Industry and Trade Co., Ltd
$26.80 10 Pieces(MOQ)

Boat Rubber Impeller Replace Jmp 8001

Hengshui Ruilaibao Rubber Plastic Products Co., Ltd