Concrete Formwork for Shear Wall and Column

Price $80.00 Compare
Min Order 300 Square Meters
Availability In Stock
Shipping From Hebei, China
Popularity 273 people viewed
Quantity
+-
 

HORIZON FORMWORK CO., LTD.

VIP   Audited Supplier 11 years
Profile Certified by SGS/BV
  • Hebei, China
  • Chang (Mr.)  
    Manager
CONCRETE FORMWORK
Steel Wood
Wall Formwork
Timber Beam & Steel Walings
High Formwork
Wall Form, Column Form, Vertical Shuttering
HORIZON
Pallet
SGS
China
7308400
Product Description
Concrete Formwork for pouring shear wall and column

High flexibility with only a few main components can meet any construction requirements. Timber beam H20, steel waling, plywood and clamp etc...These components can be combined for all shapes, even with the restructuring of wall formwork units when a frequent change of the building structure plans happens. 

Advantages: 
1. Can create any shape and size of wall formwork with any thickness. 
2. Can choose whichever form face material best meets your requirements - e. G. For smooth fair-faced concrete. 
3. Depending on the concrete pressure required, the beams and the steel waling are spaced closer or apart. This ensures optimum form-work design and the greatest economy of materials. 
4. Can be pre-assembled on your site or before arrival at your site, saving time, cost and space for you. 
5. Can match well with most Euro formwork systems. 

Wall Formwork Components: 
ComponentsDiagram / photoSpecification / description
Wall formwork panel

For all vertical formworks
H20 Timber beam

Water proof treated
Height: 200mm
Width: 80mm
Length: As per table size

Steel waling

Painted, powder coated
[12 steel channel

Flange clamp

Galvanized
To connect steel waling and H20 beams

Panel strut

Painted

Waling connector 80

Painted
Used for formwork panels alignment

Corner connector 60X60

Painted
Used for forming inner corner formwork with wedge pins

Top scaffold bracket

Painted, 
Severs as safety working platform





Packing: 

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---bundles: Timber beam, steel props, tie rod, etc. 
---pallet: Small parts will be put in bags and then on pallets. 
---wooden cases: It is available on customer's request. 
---bulk: Some irregular goods will be loaded in bulk in container. 

Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$1600.00 25 Tons(MOQ)

Flexible Ringlock Scaffolding System for Building and Bridge Construction

HORIZON FORMWORK CO., LTD.
$90.00 300 Square Meters(MOQ)

Prefabricated Wall Panels for Concrete Formwork Construction

HORIZON FORMWORK CO., LTD.
$1.00 1000 Pieces(MOQ)

Floor Prop Eurex 20 350 Used in Slab Formwork System

HORIZON FORMWORK CO., LTD.
$80.00 300 Square Meters(MOQ)

Concrete Formwork for Shear Wall and Column

HORIZON FORMWORK CO., LTD.
$130.00 1000 Square Meters(MOQ)

Construction Aluminum Formwork System 3500mm Column Shuttering Wall Panel Concrete Forms Mould

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
$40.00 50 Pieces(MOQ)

Building Material Stee Formwork for Concrete Steel Frame Formwork Construction

TIANJIN ZHIYI METAL PRODUCTS CO., LTD
$5.00 100 Sets(MOQ)

Building Formwork Support System Accessories

Hebei Leige Technology Development Co., Ltd.
$750.00 10 Tons(MOQ)

Construction Material Factory Supply Building Formwork Reusable Concrete Formwork

Zhongtai South China Heavy Industry (Hangzhou) Co., Ltd.
$54.00 2 pieces(MOQ)

2100kg Precast Concrete Magnetic Box Handle Holding Force Precast Magnet for Formwork

Ningbo Wewin Magnet Co., Ltd.
Negotiable 1000 Pieces(MOQ)

Tekko Clip, Formwork Clip, Formwork Clamp

Rizhao Wellfit Scafform Co., Ltd