| SN | Parts Name | Qty | Remark |
| 1 | Middle phase arm body | 1 set | Copper clad steel plate |
| 2 | Side phase arm body | 2 sets | Copper clad steel plate |
| 3 | Electrode clamping device | 3 sets | Spring disc clamping |
| 4 | Electrode clamp | 3 sets | Material: stainless steel |
| 5 | Electrode contact shoe | 3 sets | Forged red copper (99.9%) |
| 6 | Insulating part | 3 sets | Material: Epoxy glass cloth laminated board |
| 7 | Connecting piece | 3 sets | Between arm and column |
| 8 | Seaworthy packing, domestic transportation | 1 lot |
Fabricated according to drawings provided by the Buyer, shall provide detailed drawings of cable adapters, water / hydraulic pipe adapters, detailed connecting parts drawings, and rated current of electric furnace, hydraulic working pressure, cooling water working pressure, etc
2. Delivery period: 3 months after date the manufacturer receiving down payment.
Furnace parts







Sales team:








Audited Supplier