Formwork Springt Clamp for Tie Bars in Post Tensioning

Price $0.70 Compare
Min Order 5000 Pieces
Availability In Stock
Shipping From Hebei, China
Popularity 240 people viewed
Quantity
+-
 

HORIZON FORMWORK CO., LTD.

VIP   Audited Supplier 11 years
Profile Certified by SGS/BV
Spring Fast Clamp
Steel
Wall Formwork
Galvanized
6-10mm
Hot Treated
HORIZON
Bags & Pallet
75 x 110mm
China
7308400000
Product Description

Formwork Spring Fast Clamp for Tie Bars in Post Tensioning

Spring rapid clip is a fast and effective method for securing wire tie bars in light formwork applications.

Tensioner tools are always used to pull the wire tie bar through the clip.

Wire tie bar diameter from 5-10mm can pass through the spring clip.

Main application:

bracing formwork when being used for foundations or applied to beam formwork.

Load capacity:

6mm tension bar appr. 4KN

8mm tension bar appr. 7KN

10mm tension bar appr. 11KN

Bar Ø (mm)Plate size (mm)Weight (Kg)
5-1069 x 105 x 30.33
5-1075 x 110 x 40.42

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner!
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
Negotiable 500 Pieces(MOQ)

Tubular Post Shore for Slab Formwork Support

HORIZON FORMWORK CO., LTD.
Negotiable 1000 Pieces(MOQ)

U-Head Jack for Scaffolding System for Construction Work

HORIZON FORMWORK CO., LTD.
Negotiable 5000 Pieces(MOQ)

Formwork Tie Rod with High Tensile Strength

HORIZON FORMWORK CO., LTD.
Negotiable 300 Square Meters(MOQ)

Concrete Formwork System and Shoring for Slab Construction

HORIZON FORMWORK CO., LTD.
$10.00 1 Piece(MOQ)

High Quality Hunnebeck Topec Formwork System

RIZHAO JINHUA FORMWORK CO., LTD
$1600.00 120 Tons(MOQ)

Manufacture Concrete Reusable Precast Bridge Box Girder Beam Steel Formwork

Hunan Wuxin Intelligence Technology Co., Ltd.
$130.00 100 Square Meters(MOQ)

Aluminum Frama Formwork Economic Solutions for Wall Construction Wholesale Light Weight Aluminum Frame Formwork Concrete Wall Formwork Manufacturer

Qingdao Jiuying Formwork & Scaffolding Co., Ltd.
$20.00 1 Piece(MOQ)

3.5m Height Prumos PARA Cofragem Heavy Duty Scaffolding Steel Shoring Prop for Construction

Tianjin Honest Steel Co., Ltd.
$1050.00 1 Ton(MOQ)

Adjustable Steel Formwork for Structural Columns

Beijing Aoyu template Co., Ltd.
$1500.00 80 Tons(MOQ)

Cast-in-Situ Steel Concrete Formwork Hydraulic Forming Form Traveller for Road Construction

Hunan Wuxin Intelligence Technology Co., Ltd.