Fresh Milk Yogurt Cheese Manufacturing Production Line Processing Machine

Price $50000.00 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Jiangsu, China
Popularity 338 people viewed
Quantity
+-
 

Zhang Jia Gang Stone Mechanical Equipment Co., Ltd.

VIP   Audited Supplier 14 years
Profile Certified by SGS/BV
  • Jiangsu, China
  • Peter Fang (Mr.)  
    sales manager
SP-B-C
Ferment
Electric
CE, ISO9001
Automatic
Milk, Yogurt, Milk Powder, Cheese
Customized
STONEPACK
Wooden Case
10000*2100*1860(mm)
China
Product Description






The standard production process of pasteurized milk is as follows: raw milk → storage → filtration → preheating → homogenization → sterilization → pre-cooling → cooling → filling → CIP cleaning

Simplified production process of pasteurized milk: raw milk → storage → sterilization → cooling → filling

2. Brief introduction to technological process:

(1) the customer will store the raw milk in the original milk tank as a whole, and then drive the raw milk into the preheating tank for preheating through the special stainless steel milk pump and double filter. The preheating temperature will be around 45ºC.

(2) after the completion of preheating, the raw milk is driven into the homogenizing tank for homogenizing, and corresponding auxiliary materials are added to make the raw milk more silky and smooth after homogenizing.

(3) after homogenization is completed, open the centrifugal milk pump and drive the raw milk into the pasteurization tank for sterilization and stirring.

(4) when sterilization is needed, open the centrifugal milk pump connecting the original milk tank and the pasteurization tank, and conduct pasteurization through 350# heat conduction oil or hot water/steam. According to different heat sources and production, the sterilization usually takes about 0.5 ~ 1.5 hours and the pasteurization temperature is 85ºC.

(5) after sterilization is completed, the fresh milk is driven into the pre-cooling tank through the milk pump. The pre-cooling tank USES cold water for pre-cooling, and then it is driven into the fermentation tank to add the corresponding strains and starter for yogurt fermentation.

(6) after the overall operation is completed, CIP cleaning is needed for the equipment. The so-called CIP cleaning is called Clean In Place, which means In situ cleaning/online cleaning







 

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$3.20 750 Sets(MOQ)

Vacuum Refill Water Flask

Zhang Jia Gang Stone Mechanical Equipment Co., Ltd.
$39100.00 1 Piece(MOQ)

1 Cavity Max Volume 5L Blow Molding Machine

Zhang Jia Gang Stone Mechanical Equipment Co., Ltd.
$4.00 2000 Pieces(MOQ)

Vacuum Flask

Zhang Jia Gang Stone Mechanical Equipment Co., Ltd.
$25000.00 1 Piece(MOQ)

RO for Filling Machine

Zhang Jia Gang Stone Mechanical Equipment Co., Ltd.
$700.00 1 Piece(MOQ)

Wide Application Stainless Steel Colloidal Grinder

Wenzhou Lihong Machinery Technology Co., Ltd.
$3800.00 1 Piece(MOQ)

0.5t-1t Electric Heating Cocount Milk Uht Instant Sterilizer Pasteurizer

Wenzhou Longwan Wanyuan Food Machinery Factory
$20000.00 1 Piece(MOQ)

Stainless Steel 300L 500L 1000L Fruit Juice Milk Beverage Deaerator Vacuum Degasser Machine for Food

Wenzhou Yinuo Machinery Co., Ltd.
$100000.00 1 Set(MOQ)

Soya Milk Production Line

Harbin Modern Dairy Machinery Co., Ltd.
$28000.00 1 Piece(MOQ)

Full Ice Cream Sweetened Condensed Milk Processing Line

Zhangjun Machinery Equipment (Taizhou) Co., Ltd.
Negotiable 1 Piece(MOQ)

Direct Cooling Stainless Steel Sanitary Cooling Tank for Milk, Juice, etc

Ruian Xuanli Machinery Co., Ltd.