

TECHNOLOGY
8.Blowing units
1:Toggle balance clamping structure, with platen opening & clamping and mold platen movement by linear guide, to achieve low friction and high speed.
2:Based on the Finite Element Analysis design, and platen, toggle and platen frame made in high intensity nodular cast iron.
3:High speed mold clamping oil cylinder with differential speed function, and high speed mold moving cylinder with special anti-shock cushion valve structure.
4:Specially designed to screw with high L/D ratio insures good plasticizing and stable extrusion; high precision and no part line die head guarantees customers' top quality requirement.
5:Multi-screw & multi-die head can be adopted to improve the quality of the product and lower down the cost of material.
6:Multiple-way PID controlled temperature heating is precise and stable.



Model | Unit | EB70U85S / EB70UW85S |
Max. Product | L | 7 |
Clamping Force | kN | 85/110 |
Max. Mold Size(W x H) | mm | 580x 440 |
Screw Diameter | mm | 85 |
Screw L /D Ratio | L/D | 24 |
Screw Rotary Speed | rpm | 60 |
Extrusion Weight (HDPE) | kg/h | 120 |
Extrusion Motor Power | kW | 30 |
Pump Motor Power | kW | 11 |
Heating Capacity | kW | 21 |
Operation Pressure | MPa | 0.6-0.8 |
Air Consumption | m3/min | 3.0 |
Chilled Water Consumption | L/min | 100 |
Oil tank capacity | L | 130 |
Machine Dimension (L x w x H) | mm | 4220x3170x2600 |
Machine Weight | kg | 6200 |








A1: We are a factory for plastic machines. Over 24 Years Experience In Manufacturing Injection Molding Machine And Blow Molding Machine.
Q2: Delivery time
A2: Normally Machine Delivery from the factory in 0-60 days after receiving the down payment. (During Chinese Public Holidays like National Day or Chinese New Year, the delivery time should be 10-30 days longer accordingly).
Q3: Where is your factory located?
A3: Our factory is located in No.5 Chuangxin Xi Road, Leping Town, Sanshui District, Foshan City, Guangdong Province, China. 1h drive from Guangzhou to our factory. Welcome to visit our factory.