High Quality Aluminium Formwork Wall Slab Column Formwork System and Shuttering Concrete Modular Panels with OEM & ODM Service

Price $130.00 Compare
Min Order 1000 Square Meters
Availability In Stock
Shipping From Hunan, China
Popularity 378 people viewed
Quantity
+-
 

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
ADTO-ALUFORM
Free Technical Support
One Year
ISO, CE
Aluminum
Aluminum Formwork
Highrise Building,Repeat Villas
4mm
300 Times
ISO9001:2008;CE
ADTO
by Pallet
Max width 600mm,Length follow client's requirement
Wuhan
76109000
Product Description

Aluminium formwork is a construction system for forming cast in place concrete structure of a Building. Adto formwork system provides aluminium formwork for RCC, load-bearing, multi-storeyed buildings and enables the vertical and horizontal systems to be poured in the same operation. This increases efficiency, and also produces an extraordinarily strong structure with excellent concrete finish.


Product more details:
Material typeComplete extrusion
Thickness of panel4mm
Thickness of frame8mm
Height of frame65mm
Average weight22-25KG/Sqm
Raw materialsAluminium alloy 6061-T6
Standard wall panel width50mm to 600mm
Standard slab panel size400x1100mm
              Surface treatmentMill finish or Powder coating as client's requirement

Advatages of aluminum formwork system:
 

Light Weight

Made of aluminum alloy 6061-T6,it's average weight is around 25kg/, easy to be carried manually

 

Flexible Operation

The system can be lifted by tower crane as a whole,or dismantled and installed by labors.It allows casting of wall, beam, slab and staircase monolithically or by two stages.

 

Long reusing life   

The panel is made of extrusion profiles which is high strength and not easy to be deformed or oxidated, the reusing time can reach up to 300 times.

 

Save labor cost

Panels are connected by pin&wedges, un-skilled labors can install and dismantle the system by hammers only.

 

Shorten construction period   

 

Early-stripping application improve the system cycle and save cost for users.After pouring of concrete, wall panels could be stripped in 12 hours and slab panels 24-36 hours, finish one floor by four days only.

 

Improvement of work environment

The system fabricated at factory and requires only installation at site keeps the work environment clean and safe. 


Our factory:

Project cases:

Product packing and delivery:

Exhibition:

Certificates:

FAQ:
1.May I use this set of formwork for another project?
Yes,there are around 70% of standard panels can be reuse for next project.

2.What's your payment terms?
T/T 30% in advance and 70% balance against copy of BL, L/ C  100%, or negotiate according to the order status.

3.Do you have pre-mocking up service?
Yes, we have pre-mocking up service before shipping and make sure do not have problems on site.

4.If I don't know well about your system,How to do?
Do not worry,professinal technical support will be provided by free.

 
5.Why choose ADTO?

We are factory

We have professional engineers

We have design team for graphic design & 3D model design 

We support custom service: logo, package, panel size,  Engineering plan...

 

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$55.00 100 Square Meters(MOQ)

PVC Concrete Column Form Work Pillar Mould Construction Building Material Wall Slab Formwork Industrial Plastic Mould

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
$140.00 300 Square Meters(MOQ)

Shuttering Wall Formwork Adjustable Concrete Column Steel Pillar Mould

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
$3.00 25 Pieces(MOQ)

Professional Production Kwikstage Scaffolding Jack Base with Jack Nut

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
$130.00 1000 Square Meters(MOQ)

High Quality Engineering Material Aluminum Formwork System 6061-T6 Alloy for Construction

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
$35.00 1000 Pieces(MOQ)

Easy Concrete Recycling System Wall Formwork Price PP Board PVC Plastic Formworks Price

Tianjin Easy Scaffolding Co., Ltd.
$101.00 500 Square Meters(MOQ)

Manufacture Steel Wood Zulin Floor Form Work Construction Concrete Mould Slab Formwork

Beijing Zulin Formwork & Scaffolding Co., Ltd
$80.00 100 Square Meters(MOQ)

China Hot Sales Transfer Block Wall Formwork

Jiaxing Wangzu Industrial Co., Ltd.
$25.00 200 Pieces(MOQ)

15mm Plastic Building Formwork Concrete Wall Forms for Construction

Cangzhou Guangsu E-COMMERCE Co., Ltd.
$25.00 500 Pieces(MOQ)

Puntales Metalicos Galvanized Steel Prop Building Materials Scaffolding Steel Props Telescopic Prop

TIANJIN ZHIYI METAL PRODUCTS CO., LTD
$730.00 10 Tons(MOQ)

Competitive Price Solid Building Material Concrete Formwork Steel Formwork for Construction

Zhongtai South China Heavy Industry (Hangzhou) Co., Ltd.