Manufacturer Shaped Variable Diameter Tee Joint Pw Quick Connector Raccord

Price $0.85 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Zhejiang, China
Popularity 394 people viewed
Quantity
+-
 

Zhejiang Bailing Pneumatic Technology Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
  • Zhejiang, China
  • zoe (Ms.)  
    Trade Manager
PW16-12
Installation Explanation
Installation Explanation
Plastic
Equal Tee
90°Tee
Round
SCH STD
Cold Galvanized
Injection
2000LBS
GB
ISO
Pw6-4
Pw8-4
Pw8-6
Pw10-6
Pw10-8
Pw12-8
Pw12-10
Pw14-10
Pw14-12
Pw16-12
Pw 16-14
Bailing
Carton
5*6*3
China
3917400000
Product Description
Zhejiang Bailing pneumatic Technology Co., Ltd. is a pneumatic component manufacturer specializing in the production of MGP series guide rod cylinders, TC series three-axis cylinders, DFM series guide rod cylinders, and MGG series guide rod cylinders. Committed to providing customers with various pneumatic components, services, and solutions that meet their needs. Since its establishment, the company has developed a complete and scientific quality management system through technological innovation and accumulated experience; A stable workforce, a combination of professional technical and management personnel, continuous improvement of production and quality systems, achieving more competitive costs and continuously improving quality.
 

Installation process

 
Welding connection
 
  • Positioning and assembling: Place the Y-shaped reducing tee joint according to the required position and direction of the design, so that the joint is aligned with the center line of the pipeline, and ensure that the angle and spacing between each interface meet the installation requirements, and then perform spot welding fixation.
  • Welding operation: Perform welding according to the predetermined welding process parameters. Weld the inner weld first and then the outer weld. During the welding process, control the welding speed, current and voltage to ensure that the weld is full and uniform without defects such as pores, slag inclusions, and incomplete penetration.
  • Weld inspection: After welding is completed, perform a visual inspection of the weld to see if the weld surface is smooth and neat, and whether there are defects such as undercuts and cracks. If necessary, non-destructive testing methods such as radiographic testing and ultrasonic testing can be used to check the internal quality of the weld.
 
Threaded connection
 
  • Winding sealing material: Evenly wind an appropriate amount of Teflon tape or apply sealant on the external thread of the joint. Note that the winding direction should be consistent with the tightening direction of the thread to ensure the sealing effect.
  • Tighten the joint: Screw the joint into the internal thread of the pipeline and gradually tighten it with a pipe wrench or spanner. Be careful not to use excessive force to avoid damaging the thread. During the tightening process, ensure that the position of the joint is correct to avoid skewing or misalignment.
  • Check sealing performance: After installation is completed, perform a pressure test or water flow test to check whether there is leakage at the joint. If there is leakage, find the cause in time and repair it. It may be necessary to rewind the Teflon tape or replace the sealant and then tighten it again.
 
Compression fitting connection
 
  • Insert pipeline: Insert the pipeline into the compression fitting interface of the Y-shaped reducing tee joint to ensure that the insertion depth of the pipeline reaches the specified requirement. Generally, there will be corresponding marks on the joint and the pipeline.
  • Tighten the compression nut: Use a compression wrench to evenly tighten the compression nut so that the compression fitting tightly holds the pipeline to achieve sealing and connection. During the tightening process, pay attention to moderate force to avoid excessive deformation of the compression fitting or damage to the pipeline surface.
  • Check connection reliability: After installation is completed, gently pull the pipeline to check whether the joint and the pipeline are firmly connected without loosening. At the same time, perform a pressure test to check whether the sealing performance is good.
Model 1PW6-4
Model 2PW8-4
Model 3PW8-6
Model 4PW10-6
Model 5PW10-8
Model 6PW12-8
Model 7PW12-10
Model 8PW14-10
Model 9PW16-12
Model 10PW16-14
  

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$77.99 1 Piece(MOQ)

Three-Rod Piston Cylinder with Adjustable Stroke and Guide

Zhejiang Bailing Pneumatic Technology Co., Ltd.
$4.99 1 Piece(MOQ)

Electromagnetic Valve Control Component (XQ250622) Pneumatic Control Hand Pulled Manual Valve

Zhejiang Bailing Pneumatic Technology Co., Ltd.
$79.99 1 Piece(MOQ)

Compact Pneumatic Stamping Machine for Precision Pressing Tasks

Zhejiang Bailing Pneumatic Technology Co., Ltd.
$7.99 1 Piece(MOQ)

Air Pressure Reducing Valve, Air Pneumatic Pressure Single Unit (W1000-01) Pressure Regulating Filter Oil-Water Separator

Zhejiang Bailing Pneumatic Technology Co., Ltd.
$10.00 10 Pieces(MOQ)

Black 3/4" Tee Elbow Malleable Iron Pipe Fittings Elbow Reducer

Aqua Fitting Pipe Tech (Beijing) Co., Ltd.
$0.80 1 Piece(MOQ)

Stainless Steel Titanium Butt Tee Elbow Tee Reducer Pipe Fitting Reducing Tee

ZHEJIANG CHENGJIU PIPELINE CO., LTD.
$0.10 1000 Pieces(MOQ)

PPR Fitting Tee 100% Raw Materials DIN Standard 8077/8078

Ningbo Irriplast Irrigation Systems CO., LTD.
$0.10 1000 Pieces(MOQ)

Minde 20-110mm Pn16 PP Compression Fittings PP Coupling

Ningbo Minde Building Materials Co., Ltd.
$0.90 5000 Pieces(MOQ)

Manufacturers Wholesale High Quality Drainage and Water Supply Sch40 and 80 Fitting Coupling UPVC45 Degree Elbow

Zhejiang Yifeng Plastic Co., Ltd.
Negotiable 200 Pieces(MOQ)

Stainless Steel Fourway Pipe - Tee for Chimney Flue Kits

Suzhou Rainbow Environmental Equipment Co., Ltd.