Perforated Metal Scaffolding Steel Plank Aluminium Construction Steel Plank Scaffolding System Scaffolding Equipment Ladder Frame Scaffold Plank

Price $7.00 Compare
Min Order 100 Pieces
Availability In Stock
Shipping From Sichuan, China
Popularity 405 people viewed
Quantity
+-
 

Sichuan Taishenglan Technology Co., Ltd

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
TSL1
Online Technical Support
3year
Steel
Mobile
Tower Scaffolding
Frame Combined Scaffolding
Projecting Scaffolding
Full Scaffolding
External Scaffolding
Horizontal mobile Scaffolding
Scaffolding Frames
Building Scaffold
Customization
CE/SGS
Bundle or Bulk as Required
50PCS
7 Working Days
Construction Buliding
Concrete Site
Moder
Steel Tape Bracket
China
Product Description
Product Description
Model
Size (mm)
Weight (kg)
 
Model
Size (mm)
Weight (kg)
TSL-SP21-10
210*45*1.1*1000
3.42
 
TSL-SP24-20
240*45*1.1*2000
7.17
TSL-SP21-15
210*45*1.1*1500
4.99
 
TSL-SP24-25
240*45*1.1*2500
8.88
TSL-SP21-20
210*45*1.1*2000
6.56
 
TSL-SP24-30
240*45*1.1*3000
10.59
TSL-SP21-25
210*45*1.1*2500
8.13
 
TSL-SP24-40
240*45*1.1*4000
14.02
TSL-SP21-30
210*45*1.1*3000
9.7
 
TSL-SP25-10
250*50*1.2*1000
4.27
TSL-SP21-40
210*45*1.1*4000
12.84
 
TSL-SP25-15
250*50*1.2*2500
6.22
TSL-SP24-10
240*45*1.1*1000
3.74
 
TSL-SP25-20
250*50*1.2*2000
8.18
TSL-SP24-15
240*45*1.1*1500
5.45
 
TSL-SP25-25
250*50*1.2*2500
10.14
TSL-SP25-30
250*50*1.2*3000
12.1
 
TSL-SP25-40
250*50*1.2*4000
6.01

1.Scaffolding plank is the main parts of scaffolding sbuilding steel metal scaffolding planks boards 3mystem which is convenient for workers to walk on high building.
2.Stamping holes are on the scaffolding plank to resist skidding for workers.

Packaging & Shipping

To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.

 

Company Profile

Sichuan Taishenglan Technology Co., Ltd since 2009 is a enterprise which integrates the manufacture and sales construction materials service and customer first as the business philosophy. Our company can supply scaffolding (ringlock, kwikstage, frame) steel prop,formwork,jack base, tie rod wing nut, roofing tiles,types of scaffolding coupler, steel pipe and other related construction materials, with the Management Philosophy of "Service and Customer First". Aiming at being the leading enterprise and more than 13 years growing, it takes 80% of surrounding provinces market share,the international business spreads over more than 50 countries and areas. As an international comprehensive enterprise, we win worldwide customers by devoting itself to providing worldwide customers with advanced and excellent technology service and meeting their various needs. We are pleased to receive customers from all over the world.

Our Team
Our Factory

Our factory produces all kinds of scaffolding, we have 10 assembly lines, more than 15 years of production experience and more than 10 years of export experience.

Various lengths and sizes can be customized, and the surface can be galvanized, sprayed and other colors and treatments.
 
Exhibition&Customer


Customers from all over the world come to visit our factory.

Certifications

Our company has passed CE and SGS certification.

 

FAQ

Q1: Are you a manufacturer?
A: Yes,we have specialized in this field for about 15 years experience.

Q2: Could you provide sample?
A: Yes,we can provide sample together with our catalogue.

Q3: What information should I provide,if I want a lowest quotation?
A: The specifications of wire diameter. length, quantity, packing, etc.

Q4: How does your factory do regarding quality control?
A: We are very proud to let you know that, we use the best raw material,have at least 5 years experienced workers, the advanced machine and specialized team to assure the quality.
We perform Quality Control Inspections on 100%of our products.

Q5: How is your delivery time?
A: We always prepare enough stock material for your urgent requirement.The delivery time is 7days for all the stock material. We will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.

Q6:Whats the payment term?
A: We usually use the Credit card, T/T, PAYPAL, PAYPAL_BNPL, APPLE_PAY, GOOGLE_PAY, PIX, OXXO, BILLIE,

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$12.00 200 Pieces(MOQ)

High Load Capacity Adjustable Metal Telescopic Shoring Acrow Metal Prop Jack Scaffolding Shuttering Jacks Price Aluminium Scaffolding

Sichuan Taishenglan Technology Co., Ltd
$12.00 200 Pieces(MOQ)

Cheap Scaffolding Galvanized Pipe Formwork Adjustable Steel Prop Scaffolding Welded Steel Pipe Building Tools Metal Struts

Sichuan Taishenglan Technology Co., Ltd
$25.00 50 Pieces(MOQ)

Building Material Flip Pin Ladder Scaffold Manson Frame Scaffolding a Type Walkthrough Scaffolding Frame H for Construction Catwalk Layher Scaffolding Foldable

Sichuan Taishenglan Technology Co., Ltd
$7.00 100 Pieces(MOQ)

Perforated Metal Scaffolding Steel Plank Aluminium Construction Steel Plank Scaffolding System Scaffolding Equipment Ladder Frame Scaffold Plank

Sichuan Taishenglan Technology Co., Ltd
$10.00 200 Pieces(MOQ)

Italian Type Powder Coated/Electric Galvanized/Painted 48mm 56mm Adjustable Galvanized Jack Steel Prop Scaffolding Shoring Post Scaffold Peri Props Shuttering

Sichuan Taishenglan Technology Co., Ltd
$3.00 1000 Pieces(MOQ)

Certified Forged Beam Clamp for Scaffold Construction

Wuxi Metec Metal Co., Ltd.
Negotiable 330 Sets(MOQ)

Mobile Steel Frame Scaffold From Real Factory in Zhejiang

Jinhua Yahu Tools Co., Ltd.
$25.00 1000 Pieces(MOQ)

Hollow Adjustable Scaffolding U Head Jack Base with Base Plate

TIANJIN FRIEND STEEL TUBE CO., LTD.
$2.47 100 Pieces(MOQ)

Scaffolding System Accessories Q235 BS1139 48.3mm/60.3mm/89mm Forged / Pressed Galvanized Scaffolding Right Angle Double /Swivel / Sleeve Coupler

Nanjing Uni-Tech Metalwork Co.,Ltd
$5.15 1000 Pieces(MOQ)

Heavy Duty Plastic Sole Board

Suzhou Easebase International Trading Co., Ltd.