Conveying capacity: 30-3000t/h
Application: Widely used for transportation of various lumpy, granular and powdery materials.
Customized Solution is the Core concepts of SDCAD




PRODUCT CONFIGURATION






Belt width (mm) | Conveying length(m) Power(kw) | Conveying speed (m/s) | Conveying capacity (t/h) | ||
400 | ≤10m 3kw | 12-15 m 3-4 kw | 15-30 m 4-7.5 kw | 1.25-2.0 | 30-60 |
500 | ≤10 m 3 kw | 12-15 m 4-5.5 kw | 15-30 m 5.5-7.5 kw | 1.25-2.0 | 40-80 |
650 | ≤10 m 4 kw | 12-15 m 7.5 kw | 15-30 m 7.5-11 kw | 1.25-2.0 | 80-120 |
800 | ≤10 m 4 kw | 12-15 m 7.5 kw | 15-30 m 7.5-15 kw | 1.25-2.0 | 120-200 |
1000 | ≤10 m 5.5 kw | 10-20 m 7.5-11 kw | 20-40 m 11-22 kw | 1.25-2.0 | 200-320 |
1200 | ≤10 m 7.5 kw | 10-20 m 7.5-15 kw | 20-40 m 15-30 kw | 1.25-2.0 | 290-480 |
1400 | ≤10 m 11 kw | 10-20 m 15-22 kw | 20-40 m 22-45 kw | 1.25-2.0 | 400-680 |
1600 | ≤10 m 15 kw | 10-20 m 22-30 kw | 20-50 m 30-75 kw | 1.25-2.0 | 600-1080 |
1800 | ≤10 m 18.5 kw | 10-20 m 30-45 kw | 20-50 m 45-110 kw | 1.0-2.0 | 800-1500 |
2000 | ≤10 m 22 kw | 10-20 m 45-55 kw | 20-50 m 55-132 kw | 1.0-2.0 | 1000-2000 |
2400 | ≤10 m 30 kw | 10-20 m 55-75 kw | 20-50 m 75-185 kw | 1.0-2.0 | 1500-3000 |
Operation advantages: belt conveyor has a reliable operation, easy to realize automation and centralized control, especially for high-yield and efficient mines. Belt conveyors have become the key equipment of coal mining electromechanical integration technology and equipment.

The main parameters are generally determined according to the requirements of the material handling system, the various conditions of the material loading and unloading location, the relevant production process and the characteristics of the material.
Conveying capacity: The conveying capacity of the belt conveyor refers to the amount of material conveyed per unit time. When conveying bulk materials, it is calculated by the mass or volume of the conveyed material per hour.
Conveying speed: Increasing the conveying speed can improve the conveying capacity. When the conveyor belt is used as a traction member and the conveying length is large, the conveying speed is increasing day by day. However, high-speed belt conveyors need to be paid attention to vibration, noise and starting and braking. For conveyors that use chains as traction members, the conveying speed should not be too large to prevent increasing the dynamic load.
Component size: The component size of the belt conveyor includes the width of the conveyor belt, the width of the slat, the volume of the hopper, the diameter of the pipe and the size of the container. These component sizes directly affect the conveying capacity of the conveyor.
Conveying length and inclination: the length and inclination of the conveying line directly affect the total resistance of the
conveyor and the required power






SALES AND SERVICE NETWORK








We are a professional manufacture , we have our own R&D team and sales team, we provide one-stop service.
What is your payment term?
We accept T/T, L/C at sight, Western Union, Paypal etc.
How long is the validity of quotation?
Generally, our price is valid within one month from the date of quotation . The price will be adjusted appropriately according to the price fluctuation of raw materials and changes in market .
What is your delivery time?
Usually, we make merchandise inventory, if we have the products in stock, the delivery time is 5-10 days after receiving the
deposit. If we don't have the products in stock, we will arrange the production right now, the delivery time will be 10-30 days,It depend on the order quantity.
Do you provide OEM/ODM Service?
Yes, offer me necessary information, we provide custom-make service to meet different needs of global clients with different budgets.
How to install the equipment after purchasing?
We will provide a professional installation video to illustrate.Also provide a manual.
Yes, we guarantee our product for one year. Provide after-sales service support with and agricultural technical support.
What is your MOQ?
1Sets