
SDCAD - A pneumatic conveying system transfers dry bulk materials or powders through an enclosed conveying pipeline using pressure differential and gas flow (usually air), generated by an air movement device such as a fan, roots blower or compressor. Pneumatic conveying systems use a series of pipelines that move products by pumping air.These products typically consist of powders or granules. These systems function by moving materials through enclosed, airtight pipelines through a combination of airflow or another type of gas and pressure.

Application: Cement, fly ash, starch, sugar, salt, sand, plastic pellets, oats, polymers, lime, soda ash, plastic resin, plastic powder, dry milk, and feeds




* Can run vertically or horizontally over a long distance.
* As the system is enclosed, there is protection against dust emissions to the atmosphere and also protection of the conveyed material from external contaminants.
* Pneumatic conveying systems can be easier and more cost effective to maintain than a mechanical conveying system - fewer moving parts.
* The ability to maintain a controlled atmosphere around the material.
* Minimise system wear from abrasive materials and damage to fragile materials.
* Take up less floor space so are easier to locate.
* Can have multiple pick up and discharge points.

Pneumatic Conveying Design
The basic components of a pneumatic system are:
1. Pressure blower or vacuum pump
2. Rotary airlock valves
3. Conveying line
4. Diverter valves
5. Filter receiver
6. Cyclone separators
7. Batching systems
8. Hoppers
9. Controls

* These systems can cover a large distance running either horizontally or vertically.
* Due to the enclosure of the system, both the delivered material and dust emission to the atmosphere are protected from outside contaminants.
* Because they have fewer moving components than mechanical conveying systems, pneumatic conveying systems can be simpler and more cost-effective to maintain.
* They maintain a capacity to keep the environment around the substance under control.
* They reduce abrasive material wearing on the system and fragile materials damage.
* These systems are easier to find because they occupy less floor space.
* Various pick-up and discharge points are possible.

Pre-Sales Service | After-Sales Service |
Customer consultant 24 hour online; Engineer team provide design drawing; Skilled staff responsible for production; Take pictures for all Production process. | Provide installation instruction; Solve any problems involved; Tell the machinery maintain guidance; Regular monthly sales tracking. |













A - Our factory is with 10,000m2 factory floor area. More than 100 workers will service for you. Our factory is located in Shandong -the only province which cover all industrial sectors in China.
A - Full Process Solution Provider of Mixing, Storage, Conveying.
Q - What is your Delivery time?
A - 3-7 days for spare parts; 10-20 days for simple machine. 30-50 days for production line.
A - CE certification is provided.
A - QC checking work is including from material, steel processing, welding, painting, electric system, test, delivery, installation. Quality check for full process
Q - How can I Get Solution to my inquiry?
More project and contact information more better. Engineers will make plan for you. Our Sales manager will Quote to you in the first time.