Shuttering Vertical Steel Shuttering Formwork System

Price $140.00 Compare
Min Order 300 Square Meters
Availability In Stock
Shipping From Hunan, China
Popularity 379 people viewed
Quantity
+-
 

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
ADTO-SF
Free Proposal
One Year Warranty
ISO, ROHS, CE
Steel Wood
Column Formwork
B-Form
ADTO
Bunded, Sea Worthy
3000*1200
China
7308400000
Product Description

Easy erection B-Form Adjustable Column & Shear wall Modular Vertical Formwork Shuttering system

  • Shortage skilled labour?
  • Erect formwork too slow?
  • Difficult to reusable for next project?
  • Large disposable waste?
  • Financial pressure?

B-form adjustable column & wall formwork system can help you solve these problem.

 

More Quickly:

- Quickly erection and dismantlement: 20 minites complete a column formwork including all fastening work. 

- Modular design: suitable for any different shap and dimension vertical concrete body. 

- Don't need re-assembly when change the working place. 

- With Wheels: easy to move formwork only by manpower is enough.

- All operation by hammer is enough.

 

More Safety:

- High strength ability panel: 90KN/m2 load capacity

- Free disposal materials lead to clean worksite. More clean more safe.

- Complying with European safety standards.

 

More Simplicity:

- Only hammer be required in operation.

- Manual erection and movement, minimal crane required

- Easy to train and no skilled labour required

- Standardized panel and multipurpose accessories 

 

SIMPLE IS BEST, Only 9 regular size formwork panel:
3000x1200; 
3000x950; 3000x600;

1200x1200; 1200x950; 1200x600;
600x1200; 
600x950; 600x600; (As following drawing)

 

Regular size and customized dimenstion of ADTO formwork panel is workable.
 

Experienced engineer team help you make professional construction plan and proposal.  We are not only manufacturer but also is integral solution supplier.



  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$5.00 1 Piece(MOQ)

Heavy Duty Adjustable Aluminium Scaffolding with Pneumatic Wheels for Kwikstage Scaffold System

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
$8.00 100 Pieces(MOQ)

Metal Heavy Duty Adjustable Shoring Posts Construction Adjustable Steel Beam Support Scaffold Floor Props Jack for Build

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
$140.00 300 Square Meters(MOQ)

Shuttering Vertical Steel Shuttering Formwork System

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
$1.20 100 Pieces(MOQ)

Hot Sale BS1139 En74 Forged Pressed Scaffolding Coupler 90 Degree Right Angle Clamps Double Coupler Scaffold Fixed Coupler Rotating Scaffolding Swivel Clamp

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
$9.00 1 pieces(MOQ)

Light Weight Concrete Slab Construction Plastic Formwork

MTM BUILDING MATERIALS CO., LTD.
$135.00 500 Square Meters(MOQ)

Green Formowrk Light Weight Handset Concrete Slab Formwork for Construction

Qingdao Scaffolding Import and Export Co., Ltd.
$56.69 100 Square Meters(MOQ)

Concrete Building Formwork Can Be Cut at Will 5.5cm Thick 5.5cm Wide

Hebei Leige Technology Development Co., Ltd.
$158.00 1 Piece(MOQ)

Bridge Construction Accessories Hot DIP Galvanized Steel Beam System Aluminium Aluform Beam Steel Beam Beam Aluminium Beam Formwork System

Taishan Dongkuo Steel Structure Co., Ltd.
$100.00 1000 Pieces(MOQ)

Heavy Duty Shoring Prop Scaffold System to Support Concrete Slab

Kitsen Technologies Co., Ltd.
$1600.00 120 Tons(MOQ)

Concrete Building Construction Material Precast Bridge Steel Box Grider Formwork

Hunan Wuxin Intelligence Technology Co., Ltd.