Like stationary batching plant, the mobile batching plant is also equipped with water, cement and additive scales which can ensure the quality of the concrete. The capacity of mobile batching plant we have is from 20m³/h to 120m³/h. Welcome to contact us for details and quotations.
![]() |
2. the mixer is drum mixer;
3. the cement silo is mobile;
4. the discharging height is 1.3m. In order to use transit mixer to collect concrete, we need to use a belt conveyor or make a ramp to increase the discharging height.
YHZM series of mobile concrete batching plant | ||||
Model | YHZM20 | YHZM30 | YHZM60 | YHZM100 |
Production capacity (m3/h) | 20 | 30 | 60 | 100 |
Concrete mixer (drum mixer) | JZM500 | JZM750 | JZM1500 | JZM2000 |
Aggregate feeding mode | Belt conveyor | Belt conveyor | Belt conveyor | Belt conveyor |
Aggregate Batcher | PLD800 | PLD1200 | PLD2400 | PLD3200 |
Aggregate size(mm) | 80/60 | 80/60 | 80/60 | 80/60 |
Discharging height(m) | 1.1 | 1.3 | 1.3 | 1.3 |
Aggregate weighing accuracy (%) | ±2 | ±2 | ±2 | ±2 |
Cement weighing accuracy (%) | ±1 | ±1 | ±1 | ±1 |
Water weighing accuracy (%) | ±1 | ±1 | ±1 | ±1 |
Additive weighing accuracy (%) | ±1 | ±1 | ±1 | ±1 |
Control system | Computer | Computer | Computer | Computer |
Total power (kw) | 42 | 46 | 67.5 | 77.5 |
Total weight(T) | 12 | 13 | 16 | 26 |
![]() |
2. the mixer is twin-shaft concrete mixer (planetary mixer can be used as well);
3. the cement silo is mobile;
NYHZS series of mobile concrete batching plant | ||||
Model | NYHZS25 | NYHZS35 | NYHZS50 | NYHZS75 |
Production capacity (m3/h) | 25 | 35 | 50 | 75 |
Concrete mixer (twin-shaft mixer) | JS500 | JS750 | JS1000 | JS1500 |
Aggregate feeding mode | Belt conveyor | Belt conveyor | Belt conveyor | Belt conveyor |
Aggregate Batcher | PLD800 | PLD1200 | PLD1600 | PLD2400 |
Aggregate size(mm) | 80/60 | 80/60 | 80/60 | 80/60 |
Discharging height(m) | 1 | 1 | 1 | 1 |
Aggregate weighing accuracy (%) | ±2 | ±2 | ±2 | ±2 |
Cement weighing accuracy (%) | ±1 | ±1 | ±1 | ±1 |
Water weighing accuracy (%) | ±1 | ±1 | ±1 | ±1 |
Additive weighing accuracy (%) | ±1 | ±1 | ±1 | ±1 |
Control system | Panel | Computer | Computer | Computer |
Total power (kw) | 61 | 76 | 85 | 95 |
Total weight(T) | 13 | 15 | 19 | 22 |
![]() |
2. the mixer is twin-shaft concrete mixer (planetary mixer can be used as well);
3. the cement silo is stationary, we need to make huge concrete foundation;
4. the discharging height is 4.1m;
YHZS series of mobile concrete batching plant | ||||
Model | YHZS25 | YHZS35 | YHZS50 | YHZS75 |
Production capacity (m3/h) | 25 | 35 | 50 | 75 |
Concrete mixer (twin-shaft mixer) | JS500 | JS750 | JS1000 | JS1500 |
Aggregate feeding mode | Belt conveyor | Belt conveyor | Belt conveyor | Belt conveyor |
Aggregate size(mm) | 80/60 | 80/60 | 80/60 | 80/60 |
Discharging height(m) | 4.1 | 4.1 | 4.1 | 4.1 |
Aggregate weighing accuracy (%) | ±2 | ±2 | ±2 | ±2 |
Cement weighing accuracy (%) | ±1 | ±1 | ±1 | ±1 |
Water weighing accuracy (%) | ±1 | ±1 | ±1 | ±1 |
Additive weighing accuracy (%) | ±1 | ±1 | ±1 | ±1 |
Control system | Panel | Computer | Computer | Computer |
Total power (kw) | 60 | 72 | 92 | 102 |
Total weight (T) | 14 | 22 | 26 | 29 |
![]() | ![]() |
![]() |
![]() |
![]() |

Packing&Shipping

Our Services
Pre-sale Service
1. Answering customers' questions, helping customers choose the most suitable machines;
2. Making design drawings as per customers' requirements;
3. Providing quotations.
In-sale Service
1. Strictly control all procedures from raw materials sourcing to pre-assembly to ensure product quality;
2. Regularly updating production progress to clients;
3. After the production is completed, pre-assembly and test running will be carried out to make sure our machine works well;
4. Proper packing to minimize the risk that the machines are damaged during transportation;
5. Foundation drawing will be provided for clients to make the foundation in advance.
After-sale Service
1. Providing 7 * 24 hours online after-sales service every week
2. Providing related certificates, customs clearance documents, operation and maintenance instructions, installation videos, etc.
3. Arranging engineers to go to the client's job site. The engineers will help clients with the machine installation, machine test-running, operators' training, etc.
4. Spare parts supply;
5. Job site visiting every year.
Company Profile
![]() | ![]() |