Product Application

Item | Units | Parameters | |
JBS30-10-66R | |||
Whole performance of machine | Pump Max. theoretical. concrete output | m3/h | 30 |
Charging (hopper) capacity of mixer | m3 | 0.56 | |
Discharging capacity of mixer | m3 | 0.35 | |
Max. concrete pumping pressure | Mpa | 10 | |
Distribution valve type | S Valve | ||
Concrete cylinder diameter stroke | mm | Ф140×1000 | |
Hopper capacity | L | 400L | |
Outlet diameter | mm | Ф100 | |
Power system | Diesel engine model | -- | weifang |
Electrical engineering power | kW | 66KW | |
Rotate speed | r/min | 1800 | |
Hydraulic system | Circuit type | Open circuit | |
Pumping system pressure | MPa | 31.5 | |
Mixing system pressure | MPa | 6 | |
Capacity of oil tank | L | 350 | |
The max. Delivery distance (vertical/horizontal) | m | 80/300 | |
Other parameters | Mixer capacity | M3/h | 15m3/h |
Max. aggregate diameter | mm | 20 | |
Inside diameter of delivering pipe | mm | Ф100 | |
Dimensions:length*width*height | mm | 5500x2300x3150 | |
Total weight | kg | 5500kg | |
Tire | Pcs | 4 | |
Main Features
2) Saving labours; one operator is ok;
3) Easy to operate; remote control is available;
4) Reliable performance; If the machine is operated properly, it can work properly more than 5 years;
5) Easy to move; the machine has wheels, we can use a car to tow it to another job site easily.
Detailed Images


Packing & Delivery





1 Answering customers' questions, helping customers choose the most suitable machines;
2.Making design drawings as per customers' requirements;
3. Providing quotations.
In-sale Service
1. Strictly control all procedures from raw materials sourcing to pre-assembly to ensure product quality;
2. Regularly updating production progress to clients;
3. After the production is completed, pre-assembly and test running will be carried out to make sure our machine works well;
4. Proper packing to minimize the risk that the machines are damaged during transportation;
5. Foundation drawing will be provided for clients to make the foundation in advance.
After-sale Service
1. Providing 7 * 24 hours online after-sales service every week;
2. Providing related certificates, customs clearance documents, operation and maintenance instructions, installation videos, etc.
3. Arranging engineers to go to the client's job site. The engineers will help clients with the machine installation, machine test-running, and operators' training, etc.
4. Spare parts supply;
5. Job site visiting every year.








Audited Supplier










