XWL200 VEHICLE-mounted water well drilling rig specification | |||
The weight(T) | 4.7 | Drill pipe diameter(mm) | Φ76 Φ89 |
The hole diameter(mm) | 140-254 | Drill pipe length(m) | 1.5m 2.0m 3.0m |
Drilling drpth(m) | 200 | Rig lifting force(T) | 13 |
One-time advance length(m) | 3.3 | Rapid rise speed(m/min) | 20 |
Walking speed(km/h) | 20-40 | Fast feeding speed(m/min) | 40 |
Climbing angles(Max.) | 30 | Swing speed(rpm) | 45-65 |
Equipped capacitor(kw) | 58 | Hoisting force of winch(T) | -- |
Using air pressure(MPA) | 1.7-2.5 | Swing torque(N.m) | 3200-4500 |
Air consumpting(m³/min) | 17.31 | Size(mm) | 4350*1600*2450 |
The penetration efficiency(m/h) | 10-35 | High leg stroke(m) | 1.4 |
The engine brand | Quanchai engine |








2. Patented composite boom, double cylinder lifting;
3. Each drilling rig is equipped with a baffle on the main arm to protect the cylinder;
5. Parallel transmission design, independent oil pump, sufficient power, reasonable distribution, unique hydraulic system design, simple maintenance, low cost.
6. The whole machine uses a high-horsepower, low-torque three-wheeled tractor, which can cope with more complex road conditions and is easy to move.


1. Air power system with air compressor 2. Mud pump system with mud pump





1. Are you a trading company or a manufacturer?
2.How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
3.How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 25-30 days.
4. What's your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.