Zulin Single-Side Climbing Formwork for Dam, Pier, Concrete Protecting Wall, Tunnel

Price Negotiable Compare
Min Order 20 Tons
Availability In Stock
Shipping From Beijing, China
Popularity 449 people viewed
Quantity
+-
 

Beijing Zulin Formwork & Scaffolding Co., Ltd

VIP   Audited Supplier 5 years
Profile Certified by SGS/BV
DXB-180, DXB240
ISO
Steel and Timber
Climbing Formwork
ZULIN
Container
180, 240 or custermized
China
7308400000
Product Description
Introduction:
Single-side climbing formwork DXB-180 & DXB-240 are mainly used in the concrete pouring of dam, pier, guy anchor, concrete protecting wall, tunnel, underground workshop and so on. As the concrete lateral pressure is entirely supported by anchor system and bracket, the wall-through tie-rod and additional reinforcement are not needed. The construction is easy, rapid and economical; the finished concrete surface is perfect and the waterproofness is excellent.
 
Characteristic:
1. The lateral pressure of the concrete is entirely supported by the anchor system. Wall-through tie-rods are not needed.
2.The formwork can move backward entirely, which will be convenient for work.
3.Coupling is used for connecting the forms to make sure the forms standing in a straight line.
4.The connecting components have a high standardization and universality.
5.The formwork can prop to the finished concrete tightly to avoid dislocation or leakage.
6.The formwork can be adjusted horizontally or vertically as request.
7.DXB-180 system can be adjusted to inclined concrete pouring.

Pouring Process:
1.The 1st pouring: The lateral pressure is supported by bottom beam anchor system during the first pouring. Embedding the formwork anchor system in the wall which will be the most important supporting
parts during the next pouring.
2.The 2nd pouring (the 1st lift):The climbing bracketsare used in the secondpouring which are fixed on
the anchor system in thefinished wall.
3.The 3rd pouring (the 2nd lift): Fix the suspend platform under the whole system and the workers can remove the tensile bolts and v-climbing cones on the platform and then fill the holes left by the V-climbing cones. The later lifts are standard same as the second lift until the pouring is finished.

Our examples of application:
Wenchang Satellite Launch Site # 078 Project in Hainan ( in 2011 )
Product : Single-side climbing formworkDXB180

Project name:Yanji Meteorology Radar Tower (Jilin, China)( 181m)
Product:Single-side Climbing FormworkCB240, Auto-climbing Formwork QPM50
Construction unit: Jilin Construction Engineering co., LTD (in 2010)

Project name: Xiarong Expressway Bridge BT(3-6)part
Product: Single-side climbing formwork DXB180
Contruction unit : China Communication 2nd Navigational Bureau & China Railway First Group
Co.,Ltd.

Project name: Hanjiatuo Bridge (Chongqing, China)
Product: Single-side climbing formwork DXB180
Construction unit : The Fourth Engineering Co., Ltd. MBEC

Project name: Runyang Yangtze River Bridge (Jiangsu, China)
Product: Single-side climbing formwork DXB180
Construction unit :CCCC. Second Highway Engineering Bureau

Project name: Al Maha Sofitel Hotel (Doha)
Product: Single-side climbing formwork and wall formwork, table formwork, column formwork and
table formwork

Project name: LNG gasholder (South Korea)
Product: Single-side climbing formwork and wall formwork

Project name: U-Bora Tower ( Dubai, UAE )
Product: Single-side climbing formwork, table formwork, column formwork and beam formwork

Project name: Al-Sour Tower Project (Kuwait)
Product: Single-side climbing formwork

Project name: Majid Intersection (Saudi Arabia )
Product: Single-side climbing formwork and wall formwork


For more information, please visit www.made-in-china.com/showroom/zulinform or send email to kanshi@zulinform.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$2010.00 10 Tons(MOQ)

Online Technical Support Zulin Ringlock Mobile Stacking Tower

Beijing Zulin Formwork & Scaffolding Co., Ltd
$101.00 500 Square Meters(MOQ)

Low Price Simple Structure Steel Wood Doka Tunnel Concrete Form Floor Formwork

Beijing Zulin Formwork & Scaffolding Co., Ltd
$245.00 100 Square Meters(MOQ)

Modular Formwork Floor Panel Props Scaffolding System for Concrete Slab Pouring

Beijing Zulin Formwork & Scaffolding Co., Ltd
$101.00 500 Square Meters(MOQ)

Slab Pouring Steel Wood Zulin Construction Doka Table Formwork with Good Service

Beijing Zulin Formwork & Scaffolding Co., Ltd
$12.00 1000 Pieces(MOQ)

Construction Material Scaffolding Acro Jack Steel Prop

TIANJIN FRIEND STEEL TUBE CO., LTD.
$30.00 100 Pieces(MOQ)

Steel Frame Formwork for Concrete, 63 Frame Euro Form

QINGDAO QINYUAN STEEL CO., LTD.
$5.90 1000 Pieces(MOQ)

Concrete Construction Formwork Euro Form F Bar F Profile

Hebei Trico Trade Co., Ltd.
$15.00 500 Pieces(MOQ)

Formwork System Metal Shoring Post Galvanized Steel Scaffold Prop

TIANJIN ZHIYI METAL PRODUCTS CO., LTD
$1050.00 1 Ton(MOQ)

Customizable Formwork for Viaduct Construction

Beijing Aoyu template Co., Ltd.
$14.00 1 Piece(MOQ)

Building Metal Adjustable Shoring Post

Tianjin Honest Steel Co., Ltd.