12MW Coal Fired/Bagasse Fired Power Plant Including of 72tons Boiler, 12MW Steam Turbine and 12MW Generator Sets Video,Demo, How It Works & Features

2025-04-09 4350

Product Specifications

ZB-01
After-Sale Service
2 Years
500kw
Synchronous Generator
AC Three Phase
ISO, CE
Standard
Steam Turbine
30days
Customized
Manufacturing Plant, Energy & Mining
ZB GREAT
Wooden Case
Customized
China
8406811000
Dislike 0 Comment 0
More>Recommended Video
Steam Turbine Driven Compressor Energy Saving Project

264

High Efficiency Back Pressure Steam Turbine Generator Set/ Genset/St

414

Back Pressure Steam Turbine Generator Used to Generate Electricity in Power Plants

488

High Efficiency Low Pressure Micro Steam Turbine Back Pressure Industrial Steam Turbine Before Delivery Test New and Used

434

Extraction Condensing Steam Turbine Generator Power Generation and Heating Project

448

Condensing Steam Turbine for Power Plant 3MW/4MW/4.5MW/5MW/6MW

331

Steam Turbine Drive Project for Chemical Equipment

313

300kw, 450kw, 500kw, 550kw, 700kw Small Steam Turbine for Power Generation

326

Energy Saving Project for Steam Turbine Driven Feed Water Pump in Industrial Field

500

Biomass Power Generation Jz-Jtl New Steam Turbine with Mature Manufacturing Process

260

200 Kw Industrial Steam Turbine with High Efficiency and The Energy Saving Steam Generator

260

Extraction Condensing Industrial Steam Turbine Generator for Power Plant

258